My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-1997 Council Packet
Orono
>
City Council
>
1997
>
11-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:27:45 AM
Creation date
8/1/2023 10:24:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r CCXJNCiL MEETINGNOV lo 1997 <br />REQUEST FOR COUNCIL ACTION <br />CITY OF ORONO <br />DATE: November 10, 1997 <br />ITEM NO ^ <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Engineer's Report <br />Item Description: Entrance Canopy for Public Works Canopy <br />We have experienced problems with roof drainage causing ice buildup in front of the Public <br />Works building main entrance. The proposed solution to this problem is construction of a canopy <br />to divert the water that is draining from the roof valley out past the building entrance sidewalk. <br />This issue was previously presented to the Council and authorization was given to obtain <br />quotations for this project. The preliminary budget estimate for this project is $20,000. <br />We have completed plans for this project and contacted several contractors to obtain quotations <br />for completion of this work. The contractors have indicated that they will have prices by <br />Monday. Several contractors are waiting for approval from their bonding companies before <br />submitting quotations. Time is critical for this project, as we want this work completed before <br />winter. <br />We have put this item on the agenda without a contractor recommendation included in tl j Council <br />meeting packet to save time, as waiting until the next meeting will delay the project for two <br />weeks. A tabulation of quotes and contractor recommendation will be provided at the Council <br />meeting on Monday. <br />COUNCIL ACTION REQUESTED: <br />Review and consideration of Contractor quotations for an entrance canopy at the Public Works <br />building. A tabulation of quotations and contractor recommendation will be presented at the <br />Council meeting.
The URL can be used to link to this page
Your browser does not support the video tag.