My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-1997 Council Packet
Orono
>
City Council
>
1997
>
11-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:27:45 AM
Creation date
8/1/2023 10:24:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and place new impellers and wear lings <br />Total Part 6 - Lift Station 12 Modifications <br />Part 7 • Forcemaln Alignment <br />Deduct: <br />2,052.00 <br />l:\139\13988\REQUEST5.WB2 <br />$0.00 <br />99 4" forcemain directional bore (Item No. 13) <br />Add! <br />LF (140)20.00 <br />100 4" HDPE forcemain, SDR 17 LF 643 8.40 643 5,401.20 <br />101 4" HDPE forcemain, SDR 17, directional bote LF 45 20.00 45 900.00 <br />102 Air release manhole EA 1 1,900.00 1 1,900.00 <br />103 Sod with 4* topsoil SY 1,367 2.25 <br />104 Bituminous driveway restoration SY 33 15.50 <br />Total Part 7 • Forcemain Alignment $8,201.20 <br />Part 8 - Rcsidental Submerribk Grinder Stations <br />105 Residental simplex grinder pump sudons EA 10 3,290.00 10 32,900.00 <br />Total Part 8 • Residental Submersible Grinder Stadons $32,900.00 <br />Alternate No. 1 • MH 22 to MH 22A <br />106 8" PVC, SDR 35,10* - 12' deep in place LF 193 30.00 172 5,160.00 <br />107 Auger or ditecdonal bore 8" PVC LF 55 75.00 84 6,300.00 <br />108 Std. MH 8' dp., 4' dia., W/RI642B cstg.EA 1 1,440.00 I 1,440.00 <br />109 MH depth greater than 8' deep LF 2 100.00 5.20 520.00 <br />no Remove & transplant tree - coniferous EA 10 150.00 0 <br />Total Alternate No. 1 • MH 22 to MH 22A $13,420.00 <br />Change Order No. 1 <br />81 Furnish & plant shade tree (Sugar Maple',EA 15 500.00 15 7,500.00 <br />11 Std MH 8' dp., 4' dia., W/R1642B cstg.EA 3 1,440.00 3.00 4,320.00 <br />12 MH depth greater than 8' deep LF 6 100.00 6.00 600.00 <br />Total Change Order No. 1 $12,420.00 <br />Change Order No. 2 <br />1 4’ riser pipe extension EA 2 845.00 <br />Total Change Order No. 2 $0.00 <br />Change Order No. 3 <br />Add <br />12” corrugated PE pipe LF 154 19.00 147.00 2,793.00 <br />12” PE F£.S. with trash guard EA 1 625.00 1.00 625.00
The URL can be used to link to this page
Your browser does not support the video tag.