Laserfiche WebLink
....................................... <br />n <br />No.Item Unit <br />Contract <br />Quantity <br />Unit <br />Price <br />Quantity <br />to Date <br />Amount <br />to Date <br />1 8" PVC, SDR 35. O'- 8' deep in place LF 232 28.00 139 3,892.00 <br />2 8" PVC, SDR 35,8 -10* deep in place LF 752 29.00 1,071 31,059.00 <br />3 8- P^'C, SDR 35,10'- P '-jep n place LF 1,303 30.00 974 29,220.00 <br />4 8** PVC, SDR 35,12*-14 deep in place LF 981 31.00 1,309 40,579.00 <br />5 8** PVC, SDR 35,14*- 16* deep in place LF 1,024 32.00 968 30,976.00 <br />6 8** PVC, SDR 35,16*-18* deep in place LF 63 33.00 185 6,105.00 <br />7 8** PVC, SDR 26,14* 16* deep in place LF 220 35.00 138 4,830.00 <br />8 8" PVC, SDR 26,16'-18' deep in place LF 188 36.00 <br />9 8" DIP, 10'-12' deep in place LF 40 38.00 40 1,520.00 <br />10 8" DIP, 16'-18'deep in place LF 20 41.00 20 820.00 <br />11 Std. MH 8' dp., 4' dia., W/R1642B cstg.EA 24 1,440.00 24 34,560.00 <br />12 MH depth greater than 8' deep LF 97 100.00 102.7 10,270.00 <br />13 Directional bore 4" HDPE SDR 17 LF 140 20.00 ’140 2,800.00 <br />14 4" HDPE, SDR n LF 5,812 8.40 5,716 48,014.40 <br />15 Air release manhole EA 2 1,900.00 2 3,800.00 <br />16 1-1/2 ” curb stop and box EA 3 350.00 3 1,050.00 <br />17 Connect 4" HDPE into existing manhole EA 1 1,000.00 1 1,000.00 <br />18 4” 45 degree HDPE bend EA 16 50.00 8 400.00 <br />19 4" tee with cap EA 1 55.00 <br />20 4" X 2" HDPE tee EA 3 50.00 3 150.00 <br />21 4" X 4” HDPE tee EA 1 50.00 <br />22 2 1 /• i/2" HDPE reducer EA 3 35.00 3 105.00 <br />23 yxAS degree HDPE bend EA 3 30.00 <br />24 4" X 2" wye EA 2 30.00 1 30.00 <br />25 8" X 4" PVC service wye branch EA 48 50.00 55 2,750.00 <br />26 8" X 2" wye EA 5 50.00 <br />27 2” X 1-1/2" reducer EA 7 30.00 7 210.00 <br />28 4" PVC service pipe in place, SDR 26 LF 1,465 18.00 l,2o2 22,716.00 <br />29 4" PVC service riser pipe in place, SDR 26 LF 35 18.00 44 792.00 <br />30 4" HDPE service pipe directional bore LF 225 20.00 <br />31 1-1/2" HDPE service pipe directional bore LF 225 10.00 561 5,610.00 <br />32 Improved pipe fdn. in 6 ' increment depth LF 6,500 0.01 6,500 65.00 <br />33 Mechanical trench compaction LF 6,500 1.00 4,844 4,844.00 <br />34 Insulation SY 50 lo.u':-22 220.00 <br />35 Sanitary sewer television inspection LF 4,808 0.42 <br />36 Submersible Pump Lift Station 1 LS 1 44,200.00 0.90 39,780.00 <br />37 Submersible Pump Lift Su tion 2 LS 1 44,700.00 0,90 40.230.00 <br />Total Part 1 - Long Lake Sanitary $368,397.40 <br />l:\139V13988\REQUEST5.WB2