My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-1997 Council Packet
Orono
>
City Council
>
1997
>
11-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:27:45 AM
Creation date
8/1/2023 10:24:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />Contract Unit Quantity Amounti Na Item Unit Quantity Price to Date to Date <br />Part 1 • Pump Repairs & Clean Casing <br />Perform pump work at the following prices: <br />, 1 Remove and reinstall submersible <br />turbine pump and motor LS 1 1,322.15 1.00 1322.15 <br />2 Test pump performance LS 1 350.00 1 350.00 <br />3 Brtish casing and screen, bail well HR 8 135.00 8 1,080.00 <br />4 Shop time for cleaning and repairing <br />the pump HR 15 30.00 <br />5 4* X 20*, Sch. 40, column pipe EA 3 120.00 8 960.00 <br />6 4* X S', Sch. 40, column pipe EA 1 60.00 <br />7 4* column couplings EA 3 29.00 8 232.00 <br />8 Furnish colunui check valve EA 1 479.00 1 479.00 <br />9 Furnish and install complete set of bowl <br />bearings LS 1 120.00 <br />10 Furnish new stainless steel bowl shaft EA 1 175.00 <br />11 Machine bowl and impeller and install bronze <br />wear ting per stage EA 3 140.00 <br />12 Reassemble bowl assembly LS 1 150.00 <br />13 Furnish pitless spool seal LS i 75.00 <br />14 Replace 3 conductor motor power cable <br />including splice LP 250 2.20 <br />IS Paint column, bowl assembly, and motor LS 1 150.00 <br />Total Part 1 $4,423.15 <br />Part 2 - Work on WcU Screen <br />Perform Well Work at the following prices: <br />16 Setup equipment for jetting well casing <br />and screen LS i 1,500.00 1 1,500.00 <br />L.High pressure jetting of screen HR 30 155.00 30 4.650.00 <br />Total Part 2 •$6,150.00 <br />1 <br />t Part 3 - Test Well <br />18 Install test pump LS 1 2,000.00 1 2,000.00 <br />19 Test pump well HR 16 90.00 9 810.00 <br />1 <br />Tctal Part 3 $2,810.00 <br />r <br />1 <br />Part 4 - Increase Pump Capacity <br />20 New Pump Bowl LS 1 2.200.00 1 2,200.00 <br />! 21 New Motor LS 1 2,850.00 1 2,850.00 <br />- 22 Submersible Motor Cable LF 230 3.62 230 832.60 <br />l;\139M3993\REQUEST2.WB2
The URL can be used to link to this page
Your browser does not support the video tag.