|
PERMITS ISSUED/FEES COLLECTED YEAR-TO-DATEREPCAT NBR. BPRMTISS-1 DATE OP RUN 10/06/97PERMIT TYPEBuildingSOL PAMILY-NENSP'AOD/REMODBL8P-ACC STRUCTURE
<br />DBMO/PRINCIPAL
<br />CGMMERCIAL-NEH
<br />COM-ADD/REMODBL
<br />DEMO
<br />INST-AOD/REMODEL
<br />INST-ACC STRUCT
<br />PLAN REVIEW ONLY
<br />DEMO-ACCESSORY
<br />ACC/OARAOES
<br />Sub-total
<br />Mechanical
<br />HEATINQ SYSTEMS
<br />AIR CONDITIONING
<br />HOOD STOVB/PLUE
<br />PIREPLACE
<br />VENTILATION
<br />PUBL STC«AQE
<br />GAS LINT INSPECT
<br />DUCT WORK (»n.Y
<br />REMOVE OIL TANK
<br />UNDEPINED
<br />Sub-total
<br />Pluad>ing
<br />PIXTURES
<br />SPRINKLER
<br />HATER METER
<br />VACUUM BREAKER
<br />UNDEPINED
<br />Sub-total
<br />Sewer k Water
<br />SEWER CONNECTION
<br />WATER CONNECTION
<br />NEW SEPTIC SYSTE
<br />ORNPLD k/OR TANK
<br />SAC ONLY
<br />SEWER DISCXEINBCT
<br />SEWER k WATER
<br />UNDEPINED
<br />Sub-total
<br />Sign
<br />PBRMKNENT/PO '^D
<br />PBR./PRBE STANDO
<br />QTY2324221
<br />12
<br />1
<br />8
<br />2
<br />2
<br />1
<br />0
<br />9
<br />PERMIT ISSUED REPORT CITY OF ORONO *****PAGE: 1REQUESTER: CAROLE-- CURRENT RANGE - 01/01/97 - 09/30/97 -- PREVIOUS RANGE - 01/01/96 - 09/30/96BASE FEE46,575.50 61,12?.25 3.750.00
<br />C90.00
<br />087.25
<br />3,204.25
<br />100.00
<br />1,579.50
<br />29.25
<br />0.00
<br />300.00
<br />VALUATION7,557,970.035,513,038.22304,991.600.00
<br />100,000.00
<br />356.696.00
<br />0.00
<br />194.310.00
<br />775.00
<br />0.00
<br />0.00
<br />PLAN REVIEW30,274.03 28,634.15 2,403.06
<br />0.00
<br />.71
<br />.72
<br />.00
<br />.21
<br />576
<br />413
<br />0
<br />219
<br />19.01
<br />0.00
<br />0.00
<br />QTY31209247
<br />1
<br />6
<br />1
<br />3
<br />0
<br />1
<br />2
<br />BASE FEE62,082.2544,691.502.922.75
<br />490.00
<br />4,948.50
<br />1.688.75
<br />80.00
<br />2,349.25
<br />0.00
<br />o.co
<br />60.00
<br />VALUATION10,050,297.003,530,427.00171.982.00
<br />0.00
<br />985,000.00
<br />167.026.00
<br />0.00
<br />252.720.00
<br />0.00
<br />0.00
<br />0.00
<br />6 1,258.00 81,527.80 817.70 1-2,570.25 154,292.00
<br />327*119,496.00*14,109,308.65*63,357.59*302*121,883.25*15,319,744.00*
<br />‘80 8,182.37 63^,811.38 0.00 77 6,985.89 541,133.28
<br />9 434.13 28,895.00 0.00 16 772.40 53,051.00
<br />1 35.00 2,500.00 0.00 2 97.01 6,060.43
<br />45 1,679.69 81,698.55 0.00 53 2,237.71 129,265.44
<br />7 245.00 11,060.00 0.00 5 175.00 5,375.00
<br />1 125.00 10,000.00 0.00 1 35.00 1,000.00
<br />16 560.00 7,450.00 0.00 5 365.00 21,750.00
<br />7 245.00 8,365.00 0.00 9 357.94 15,125.00
<br />11 1,200.00 79,750.00 0.00 10 370.00 15,325.00
<br />1 35.00 900.00 0.00 0 0.00 0.00
<br />178*12,741.19*067,429.93*0.00*178*11,395.95*788,005.15*
<br />128 9,169.09 571,746.86 0.00 123 8,650.48 547,272.21
<br />4 231.69 14,535.00 0.00 0 0.00 0.00
<br />10 1,811.99 0.00 0.00 8 1,064.00 2,750.00
<br />5 175.00 1,200.00 0.00 0 0.00 0.00
<br />2 70.00 1,150.00 0.00 4 140.00 1,150.00
<br />149*11,457.77*588,631.86*0.00*135*9,054.40*551,172.21*
<br />7 245.00 0.00 0.00 14 490.00 0.00
<br />2 •>0.00 0.30 0.00 1 35.00 0.00
<br />26 2,600.00 0.00 0.00 43 4,250.00 0.00
<br />2 100.00 0.00 0.00 4 200.00 0.00
<br />5 4,750.00 0.00 0.00 11 6,550.00 0.00
<br />0 0.00 0.00 0.00 1 35.00 0.00
<br />3 210.00 0.00 0.00 6 420.00 0.00
<br />2 70.00 0.00 0.00 0 0.00 0.00
<br />47*8,045.00*0.00*0.00*HO*11,900.00*0.00*
<br />0 0.00 0.00 0.00 1 35.00 0.00
<br />3 110.25 3,300.00 0.00 1 29.25 800.00
<br />4m
<br />PLAN REVIEW40,35321,4931,6990
<br />3,216
<br />374
<br />0
<br />0
<br />0
<br />1,714
<br />0
<br />1,484
<br />70,336
<br />.39.76.45.00
<br />.53
<br />.89
<br />.00
<br />.00
<br />.00
<br />.21
<br />.00
<br />.28
<br />.51*
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00*
<br />0.00
<br />0.00
<br />0.00
<br />o.oc
<br />0.00
<br />0.00*
|