My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-27-1997 Council Packet
Orono
>
City Council
>
1997
>
10-27-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:22:06 AM
Creation date
8/1/2023 10:15:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ 'COUNCIL MEETINGOCT 2 7 1997 <br />REQUEST FOR COUNCIL ACTION <br />cmroFORONO <br />DATE: October 24, 1997 <br />ITEM NO: Q. O <br />Department Approval: <br />Name Ron Moorse <br />Title City Administrator <br />Administrator Reviewed:Agenda Section: <br />City Administrator’s <br />Report <br />Item Description: <br />Resolution Adopting the Assessment Roll for the Orono Ice Arena Water and Sewer Project <br />The extension of municipal water and sewer service was required to enable the Orono Ice Arena <br />project to move forward. The Orono Ice Arena Inc. and Orono School District each signed a petition <br />requesting the water and sewer extension project and indicating their willingness to pay 100 per cent <br />of the project cost. The initial estimate of the project cost was $102,995. In addition to this cost, <br />the Orono Ice Arena Inc. as part of its site utilities work installed two hydrants to provide for fire <br />suppression at the building site. Because these hydrants are generally owned and maintained by the <br />city, the city agreed to reimburse the Orono Ice Arena Inc. for their costs for the hydrants and assess <br />this back to the Orono Ice Area Inc. to be paid over a 15 year assessment period. This brought the <br />total water and sewer costs to $113,545. <br />Due to bids coming in substantially below the engineer's estimate, the actual cost of the project <br />including two hydrants is $95,210. This is a reduction of $18,335 or 16.1%. A resolution reflecting <br />the assessment for the water and sewer project is attached for Council adoption. <br />COUNCIL ACTION REQUESTED: <br />Motion to adopt a resolution adopting the assessment roll for the Ice Arena water and sewer project.
The URL can be used to link to this page
Your browser does not support the video tag.