My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-1997 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1997
>
10-13-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 10:09:37 AM
Creation date
8/1/2023 10:05:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON SEPTEMBER 15, 1997 <br />indicated that the attorneys for the chy and applicant have aj^'eed that the subdivision is a <br />Class I, metes and bounds division, as the property is not platted and will not require paric <br />dedication. <br />Gaffiron recommended the property line be moved for Lot A as the northern portion of <br />Bayside Road would be less than 5 acres. There is a small wetland located to the east, <br />north of Bayside Road, which will have a Conservation and Flowage easement as well as <br />that portion on the south side abutting Lake Minnetonka via the channel. A concern was <br />voiced that depending on where the 929.4 lake elevation is located, the property could be <br />considered a lakeshore lot. If so, parcels A and B would not meet the 500' width <br />requirement measured at the shoreline and at the 75' setback. Due to this, the Staff and <br />City Attorney have concluded that this split is not exempt but must be at least considered <br />a Class I Subdivision. The 2 acre minimum is met by the parcels and Gafiron noted that <br />the property could be further subdivided in the future. <br />Gaflfron requested the applicant show the 929.4 contour on the survey. Parcel A includes <br />a bam and out buildings that will have to be removed. Gaffron recommended the <br />removals occur within six months of the subdivision approval. Septic system testing has <br />taken place. The house meets all setback requirements. <br />Gaf&on reviewed the issues for discussion as noted in the packet. <br />The applicant had no further comments to add at this time. <br />Lindquist asked White if he was willing to move the lot line to accommodate parcel A <br />having at least 5 acres of dry buildable. White said he would as it was his intent to have
The URL can be used to link to this page
Your browser does not support the video tag.