Laserfiche WebLink
r 10/10/1397 07:13 6124043:;:;7 <br />OCT-08-97 wed 13:42 GL CONTRACTING <br />wlQH( (SCKI <br />FAX NO. 6124759592 <br />pa-:iE o? <br />P. C2 <br />CONTRACTING INC <br />4300 WiaOW DRIVE MEDINA MN 55340-9701 PHONE 612-478-9529 FAX 612-478-9592 <br />October 8,1997 <br />Tim Johnson <br />RE: Spring Hill Golf Club Box Culvert Schedule <br />The following schedule is based on plans by Schoell & Madson and assuming a <br />go ahead date of Oct 10th. <br />Oct 13-17th build pipe <br />Oct 20th Begin traffic detour and start excavation <br />Oct 23rd and 24th Set box <br />Oct 27-29th Prepare for blacktop <br />Oc! 30-31 St blacktop <br />Nov 3-4th cleanup <br />Nov 5th rernove detour <br />Two Saturdays are available for lost time days v/lth this schedule. <br />We would Intend to work on the turn lane at the same time as the box culvert and <br />complete simultaneously. <br />If we are required to maintain one lane of traffic add eight working days for a <br />completion on Nov 17th. Costs will also significantly increase if this method is used. <br />David Swanson President <br />5