Laserfiche WebLink
36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />57 <br />59 <br />60 <br />61 <br />62 <br />64 <br />Part 2 • Restoration <br />Bituminous surfacing removal <br />Common excavation <br />Class 5 aggregate base (100% ciusbed) <br />Type 31 bituminous base course <br />Type 41A bituminous wearing course <br />Geotextile fabric <br />Bituminous material for tack coat <br />Bituminous street patching <br />Clearing and grubbing <br />Sawcut bituminous <br />Biniminous driveway restoration <br />Concrete driveway restoration <br />27* diam. catch basin with casting <br />Remove existing CMP culvert <br />Fiimish and install 15* CMP culvert <br />IS* CMP flared end <br />Boulder retaining wall <br />Sod with 4* topsoil <br />Seed with topsoil, mulch and fertilizer <br />Erosion control fence <br />Wild flower seeding <br />Furnish and plant Evergreen Tree (Blue <br />Spruce) 6* high <br />Furnish and plant shade tree (Sugar Maple) <br />4* diameter <br />Remove and transplant bushes <br />Remove and transplant tree • Desiduous <br />Remove and transplant tree - Coniferous <br />Total Part 2 • Restoradon <br />SY 4.000 1.50 4.000 6.000.00 <br />CY 2.100 3.50 710 2.485.00 <br />TN 2.500 9.00 1.472 13,248.00 <br />TN 600 28.50 <br />TN 600 29.00 <br />SY 4.700 1.25 2.687 3.358.75 <br />GL 300 1.20 <br />SY 700 6.75 <br />LS 1 5.000.00 1.0 5.000.00 <br />LF 100 6.00 <br />SY 600 6.75 <br />SF 100 10.00 <br />EA 1 1.000.00 1 1.000.00 <br />LF 150 5.00 65 325.00 <br />LF 150 20.00 53 1.060.00 <br />EA 4 150.00 <br />SF 80 14.00 <br />SY 13.000 2.00 4,500 9.000.00 <br />AC 0.4 3.280.00 <br />LF 1.000 2.00 590 1,180.00 <br />SF 800 0.30 <br />EA 20 220.00 <br />EA 20 600.00 <br />LF 300 16.00 <br />EA 40 50.00 6 300.00 <br />EA 15 300.00 <br />EA 15 300.00 <br />Change Order No. 1 <br />ADO <br />Residentail simple grinder pump stadons <br />Total Alternate No. 2 <br />Alternate No. 3 Bid - Diiecdonal Bore 8* HOPE, <br />MH-1 to MH-9 <br />l;M3SM3890\REQUEST2.WB2 <br />$42,956.75 <br />1 3.600.00 <br />$0.00 <br />.IL—--------