Laserfiche WebLink
and place new impellen and wear tings <br />Total Part 6 - Uft Station 12 Modifications <br />Part 7 • Forcemain Alicmnent <br />2,05100 <br />Total Change Order No. 2 <br />Change Order No. 3 <br />Add <br />12" conugated PE pipe <br />12" PE F.E.S. with trash guard <br />LF <br />EA <br />154 19.00 <br />1 625.00 <br />147.00 <br />1.00 <br />l:\139V13988VtEQUEST4.WB2 <br />$0.00 <br />Deduct: <br />99 4" forcemain directional bore (Item No. 13)LF (140)20.00 <br />Add: <br />100 4" HDPE forcemain, SDR 17 LF 643 8.40 643 5,401.201014" HDPE forcemain, SDR 17, directional bore LF 45 20.00 45 900.00102Air release manhole EA 1 1.900.00 1 1,900.00103Sod with 4** topsoil SY 1,367 2.25 <br />104 Bituminous driveway restoration SY 33 15.50 <br />Total Part 7 - Forcemain Aligmnent <br />$8,201.20 <br />Part 8 - Residental Sobmersible Grinder Stations <br />105 Residental simplex grinder pump stations EA 10 3.290.00 <br />Total Pait 8 • Residental Submersible Gnnder Stations $0.00 <br />Alternate No. 1 - MH 22 to MH 22A <br />106 8" PVC, SDR 35,10' - 12* deep in place LF 193 30.00 172 5,160.00 <br />107 Auger or directional bore 8" PVC LF 55 75.00 84 6,300.00 <br />108 Std. MH 8' dp., 4' dia., W/R1642B cstg.EA 1 1,440.00 1 1,440.00 <br />109 MH depth greater than 8' deep LF 2 100.00 5.20 520.00 <br />110 Remove & transplant tree - coniferous EA 10 150.00 0 <br />Total Alternate No. 1 - MH 22 to MH 22A $13,420.00 <br />Change Order No. 1 <br />81 Furnish & plant shade tree (Sugar Maple)EA IS 500.00 <br />11 Std MH 8* dp., 4' dia., W/R1642B cstg.EA 3 1,440.00 3.00 4320.00 <br />12 MH depth greater than 8' deep LF 6 100.00 6.00 600.00 <br />Total Change Order No. 1 $4,920.00 <br />Change Order No. 2 <br />* <br />1 4" riser pipe extension EA 2 845.00 <br />$0.00 <br />2,793.00 <br />625.00