Laserfiche WebLink
Part 2 'Water Main <br />8- DIP, Class 52 <br />12-DIP, Class 52 <br />6- DIP, Class 52 <br />Cut into existing 8” CIP <br />Cut into existing 6" DIP <br />Hydrant <br />5" gate valve and box <br />8" gate valve and box <br />12" butterfly valve and box <br />Fittings <br />Mechanical trench compaction <br />Improved pipe foundation in 6" increments <br />Total Part 2 - Watermain <br />Part 3 • Restoration <br />Clear and grub <br />2' X 3* sump catch basin <br />4’ diameter sump catch basin manhole <br />Catch basin manhole overdepth <br />Bituminous surfacing removal <br />Common excavation <br />Class 5 aggregate base (100% crushed) <br />Type 31 bituminous bas$ course <br />Type 41A bituminous wearing course <br />Gcotextile fabric <br />Bituminous material for tack coat <br />Bituminous street patching <br />Sawcut concrete driveway <br />Sawcut bituminous <br />Bituminous driveway restoration <br />Concrete driveway restoration <br />12- RCP in place <br />15-RCP in place <br />15" RCP, over 8* deep <br />15" RCP flared end in place with trash guard <br />Mechanical trench compaction <br />Improved pipe fiid. in 6" increment depth <br />Remove existing CMP culvert <br />l:\139\13988\REQUEST4.WB2 <br />920.00 <br />15.158.00 <br />190.00 <br />1,000.00 <br />800.00 <br />2,000.00 <br />600.00 <br />1.500.00 <br />1,000.00 <br />850.00 <br />639.00 <br />1.00 <br />$24,658.00 <br />EA 20 300.00 51 15,300.00 <br />EA 2 1,000.00 2 2,000.00 <br />EA 5 1,200.00 5 6,000.00 <br />LF 17 125.00 5 625.00 <br />SY 11,600 1.00 11,500 11,500.00 <br />CY 3,700 3.25 4,532 14,729.00 <br />TN 8,000 9.20 9,206 84,695.20 <br />TN 1,200 23.50 962 22,607.00 <br />TN 900 27 JO <br />SY 11,000 1.00 10,819 10,819.00 <br />GL 550 1.00 <br />SY 300 6.50 <br />LF 100 5.00 <br />LF 650 1.50 <br />SY 1,550 6.50 <br />SF 3,200 3.50 <br />LF 233 22.00 86 1,892.00 <br />LF 141 24.00 121 2,904.00 <br />LF 20 26.00 <br />EA 2 900.00 1 900.00 <br />LF 595 1.00 207 207.00 <br />LF 595 0.01 <br />LF 450 2.00 100 200.00