Laserfiche WebLink
4. <br />5. <br />6. <br />7. <br />Softener schemaftc. >he hardness <br />prXc'inT'e^ements. 80 parts persrj£,T-;."2r set; nS^—- <br />filter are discharged to the City sewer. <br />Reeonnnended improvements and -«^mate—completed an evaluation smdy <br />in 1995 with the following recommended improvements. <br />8. <br />Filter refurbishment <br />Softening unit control replacement <br />Chlorine solution water line relocation <br />Brine storage tank cleaning <br />Softening unit renovation <br />Softening unit discharge meters <br />Electrical systems replacement <br />Automatic control valve replacement <br />Ventilation/dehumidification improvements <br />Controls replacement (SCADA) <br />Piping replacement <br />Engineering and contingency <br />$ 220,900 <br />17,000 <br />8,500 <br />8,000 <br />79,900 <br />23,400 <br />43.100 <br />9,600 <br />102,500 <br />73.100 <br />30,000 <br />123,200 <br />$ 739,200 <br />TOTAL <br />be from September to November of 1998. <br />Proposed project fmanelng. Financing Is <br />200,000- Cash Reserves , qqq <br />Internal Loan from Sewer Fund 27C>,8UU <br />TOTAL $740,000 <br />Assessment area. An assessment would ^ <br />water system and capable of using the system. This is approxim y