Laserfiche WebLink
Notice of Planning Commission Action <br />September 16, 1997 <br />Page 2 <br />7. Approval of vacation of platted lane adjacent to Luce Line. <br />8. Additional City right-of-way shall be dedicated for the road curve at the southeast <br />comer of Lot 2, sufficient to meet City curve requirements. City to grant easement to <br />Lot 2 for use of said right-of-way for septic system drainfield, with a stipulation that <br />City will not use the right-of-way for road reconstruction or relocation until that location <br />is no longer needed for sewage treatment system. <br />9. Council to consider applicants’ responsibility for future road improvements in terms of <br />past City policy and practice. <br />10. Public Services Director and City Engineer to recommend and oversee improvements <br />to sight distance at the curve southeast of Lot 2, and such improvements to be paid for <br />by the applicant. Such improvements may include, but are not limited to, selective <br />vegetation clearing and regrading of hillside slope adjacent to traveled roadway (while <br />still meeting the intent of Item #8 above). <br />11. Driveways for Lots 1 and 2 shall be from Outlot B. Lot 2 shall have no direct access <br />from Lyman Avenue. <br />Applicant's next scheduled meeting is confirmed as: <br />City Council on Monday, September 22, 1997; meeting starts at 7:00 p.m. <br />If you desire certified copies of the official Planning Commission minutes, they are available <br />from the City Recorder affer review and approval by the Planning Commission. <br />♦ 'i