My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-1997 Council Packet
Orono
>
City Council
>
1997
>
09-22-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:54:55 AM
Creation date
8/1/2023 9:50:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
; <br />2. <br />3. <br />4. <br />3. <br />4. <br />5. <br />6. <br />If a retention pond or other stormwater facilities are required by the Minnehaha <br />Creek Watershed District (MCWD), any such facilities to be developed on the site <br />shall also be designated on the plat as drainage easements. The final plat <br />application shall not be presented for City Council approval until all MCWD <br />approvals have been obtained by the suMivider. <br />The City protected wetlands in Lots 1, 2 and 3 shall be subject to a Flowage and <br />Conservation Easement to be granted to the City by the subdivider. <br />Applicant shall develop a covenant for Type 1 wetlands located within Lots 1 and <br />2. The purpose of the covenant is to alert all future property owners of the need <br />to protect the area and if alterations are proposed to first obtain the necessary <br />approvals from the Corps of Engineers and the Minnehaha Creek Watershed <br />District before applying for approvals from the City of Orono. ^ ^ <br />• ° -.L'l <br />The subdivider shall bear the cost of sightline improvements-withnrthe-newly^ <br />dedicated right-of-way, subject to recommendation and oversight of the Public <br />Services Director and City Engineer. Such improvements may include but are not <br />limited to selective vegetation removal and regrading the hillside slope at the inside <br />of the curve. <br />The principal structure on Lot 1 shall be set back at least 50 feet from the easterly <br />lot line and iO feet from the southerly lot line of Lot 1 . <br />Lot 3 may continue to use the existing easement driveway for access to Lyman <br />Avenue. Lots 1 and 2 shall gain access to Lyman Avenue via a shared private <br />driveway in Outlot B. Lot 2 shall not have direct access to Lyman Avenue other <br />than via Outlot B. The subdivider shall submit a an acceptable grading and <br />drainage plan for the shared driveway priot to final plat approval. The driveway <br />when constructed by the owner(s) of Lots 1 and 2 shall adhere to the approved <br />plan. <br />At the time of building permit approval or driveway construction for Lot 1, the <br />owner of Lot 1 shall provide sufficient additional screening near the southeast <br />comer of Lot 1 to prevent vehideJieadlightHtom shining into the rear yard of <br />Page 5 of 9 <br />6^
The URL can be used to link to this page
Your browser does not support the video tag.