Laserfiche WebLink
rv. Cost Analysis <br />A detailed cost estimate appeared in the section titled II. Summary and RecommftnHaHnng and <br />appears again, below. Line item 12. Engineering and Contingency includes a 5% contingency and <br />a 15% allowance for design, inspection, legal and administrative costs. The cost estimate is based <br />on anticipated 1998 construction pricing. <br />;er <br />Table 1. Cost Summary <br />Item Estimated Cost <br />1.Filter Refurbishment $220,900 <br />2.Softening Unit Control Replacement 17,000 <br />3.Chlorine Solution Water Line Relocation 8,500 <br />4.Brine Storage Tank Cleaning 8,000 <br />5.Softening Unit Renovation 79,900 <br />6.Softening Unit Discharge Meters 23,400 <br />7.Electrical Systems Replacement 43,100 <br />8.Automatic Control Valve Replacement 9,600 <br />9.Ventilation/Dehumidification Improvements 102,500 <br />10 Controls Replacement (SCADA)73,100 <br />11 Piping Replacement 30,000 <br />12 Engineering and Contingency 123,200 <br />TOTAL $739,200 <br />r" <br />r <br />Navarre WTP Rehabilitation 8