My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-1997 Council Packet
Orono
>
City Council
>
1997
>
09-08-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:16:27 AM
Creation date
8/1/2023 9:14:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■''C/4 <br />%■ <br />REQUEST FOR COUNCIL ACTION Ctry <br />6 <br />C; <br />DATE: September 8, 1997 TT^h^O.: ^ <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Engineer's Report <br />Item Description: Resolution to Accept Feasibility Study and Schedule a Public Hearing for the <br />Navarre Water Treatment Plant Rehabilitation <br />Bonestroo Engineer's has completed a feasibility study for this project. The proposed project <br />financing is described below. <br />1) Assessment on all properties in the Navarre water system service area. <br />$350 X 752 properties = $263,200. Assessment to be payable over a 5 year time period. <br />2) $200,000 from cash reserves in the water fund <br />3) $276,800 internal loan to the water fund from other City funds. <br />Total estimated project cost: $740,000. <br />We are projecting a 2.95% per year increase in water rates for the next 15 years based on current <br />trends. This annual rate increase should provide adequate funding for effective maintenance and <br />operation of the water system. <br />The proposed schedule is to bid the project in January 1998 and begin construction in September <br />1998. This will allow time for the contractor to order and receive the new electrical control <br />equipment before starting construction after the summer peak water usage season. Completion of <br />construction is anticipated for November 1998 <br />A public hearing is scheduled for 6:30 P.M. on Tuesday, September 23rd at the Oronc High <br />School Cafeteria to solicit comments on the proposed project and funding sources. The attached <br />resolution accepting the feasibility study and scheduling the public hearing needs to approved by <br />the Council. <br />COUNCn. ACTION REQUESTED: <br />Motion to approve resolution to accept the feasibility study and schedule a public hearing on the <br />Navarre water treatment plant rehabilitation for 6:30 P.M. on Tuesday September 23rd at the <br />Orono High School Cafeteria
The URL can be used to link to this page
Your browser does not support the video tag.