My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-1997 Council Packet
Orono
>
City Council
>
1997
>
09-08-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:16:27 AM
Creation date
8/1/2023 9:14:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />minutes of the orono planning commission <br />meeting held on JANUAP,.Y 21, 1997 <br />(#7 - #2202 County Road 15 Improvement - Continued) <br />Smith asked what impact the filling of wetlands would have on the wUd life in the area. <br />Settles said the reports indicate there will be no impact noting the land is only a long, <br />narrow stnp. <br />nuth inquu-ed if there would be any detours or rerouting of traffic. She was informed <br />tMt the construction would be staged such as half the road would be built at a time <br />allowing for on-going two-lane traffic by use of one lane and the shoulder. <br />McMillan questioned the surcharging. Guy Knowlan said the surcharging will make use <br />ot a select granular sand, which over an appro.ximate 6 month period of time wUl <br />compress the air and water out of the material to allow Class 6 and bituminous to be laid <br />over It. The north <5»de would be affected 1.2 meters and driveways will be left lower to <br />accommodate the surcharging. <br />There were no public comments. <br />Gaffron informed Lindquist that the Council is considering a ponding agreement but does <br />not wash to delay the project. Polaczyk noted the construction cooperative agreement <br />between Hennepin County and Orono states such language listing the responsibilities <br />regarding maintenance and funding participation between the County and City. He <br />explamed the costs regarding right-of-way and construction as well as the City <br />contribution of the Femdale Cutoff for mitigation. <br />Schroeder moved, Lindquist seronded, to recommend approval of the CUP and variances <br />for alteration of existing wetlands in conjunction with the reconstruction of County Road <br />15 from Orono Orchard Road to the eastern border of the City with the recommendation <br />that the Council pursue alternate mitigation sites. Vote: Ayes 4 NaysO <br />SKETCH PLAN/COXCEPTUAL REVIEWS <br />(#8) #2203 TED WOLF, 900 WILLOW DRIVE - SKETCH PLAN REVIEW FOR <br />PROPOSED CLASS HI SUBDIVISION <br />The applicant was represented by Mark Gronberg and Mike Hilbelink. <br />6- <br />I
The URL can be used to link to this page
Your browser does not support the video tag.