Laserfiche WebLink
#2238 <br />May 14, 1997 <br />Page 4 <br />amortization might be attractive. However, this is a variance request to add to the bulk of structure <br />in a non-conforming location and the lakeshore deck is an obvious and relevant immediate trade-off <br />in the opinion of staff. <br />Staff Recommendation <br />Staff recommends the following: <br />1. <br />3. <br />Approve hardcover variance in 75-250' zone subject to the proposed removals, with <br />exploration of the possibility of removing the loop driveway in 0-75' zone, or at <br />least defining its maximum allowed width in the 0-75' so it doesn't expand... <br />Approve deck enclosure only per conditions similar to those under which it was <br />approved in 1995: <br />a. The deck and screen porch shall not extend past the southerly wall of the house. <br />The stairway may be in addition to the 8' x 24' deck and shall be located at the <br />north end of the deck, and shall not exceed 4' in width, and shall be only of the <br />length necessary to accommodate the stairway and landing. <br />b. This approval allows excavation in the 0-75' zone only in the amounts to <br />accommodate construction of the deck and screen porch. <br />c. The proposed low boulder walls between house and lake are specifically not <br />approved, and shall not be constructed. <br />d. Prior to footing inspection, applicant shall remove the grade-level wood patio <br />3' X 8' portion that extends outside the existing deck footprint. Applicant shall <br />further remove the small accessory building located at the southeast side of the <br />property, and shall remove the 120 s.f. detached deck structure located at the <br />lakeshore. prior to footing inspection. <br />Applicant shall remove gravel from the driveway areas to be made non-hardcover, <br />and shall topdress and revegetate these areas by seeding or sodding, such work to be <br />substantially completed prior to final inspection of the additions. <br />Applicant to obtain a building permit prior to construction of the garage and an <br />after-the-fact building permit prior to reconstructing the deck enclosure. <br />Options for Action <br />1. Recommend approval per staff recommendation or with additional or revised conditions. <br />2. Recommend partial approval. <br />3. Recommend denial. <br />4. Table for further information. <br />5. Other.