My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-25-1997 Council Packet
Orono
>
City Council
>
1997
>
08-25-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:09:20 AM
Creation date
8/1/2023 9:05:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonestroo <br />Rosene <br />Anderflcfi <br />ta|w«rt4ArMfcti <br />LlL&iiiiaUiite. <br />Ssusij___City of Orono. P.O. Box 66, Crystal Bay, MN 55323-0066 <br />Contractor Barbaross a & Sons. 11000 93rd Avenue North. Osseo. MN 55369 <br />Bond Co. <br />Date August 19.1997 <br />CHANGE ORDER NO. 1 <br />BAY RIDGE / BRACKETTS POINT SANITARY SEWER <br />FUe 13990 <br />Description of Work <br />Directional bore 8" HDPE from 100 feet south of MH-2 to MH-9A and from MH-2 to MH-3. Also <br />directional bore 3 inch HDPE forcemain from MH-2 to MH-3. These changes are necessary due to <br />imstable soils encountered at pipe grade and realignment of pipe due to easement negotiations. Also directional bore <br />3 inch HDPE forcemain from station 10+00 to station 14+80 in the Bay Ridge portion of the project. This change is <br />due to a condition set forth by Hennepin County as part of their permit for this project. Alternate bid No. 2 and <br />No. 3 should have been a part of the original contract but were mistakenly omitted from our bid award <br />recommendation letter. <br />No.Item Unit <br />Contract <br />Quantity <br />Unit <br />Price <br />Total <br />Amount <br />ADD <br />Residentail simple grinder pump stations <br />Total Alternate No. 2 <br />1 3,600.00 3,600.00 <br />3,600.00 <br />Alternate No. 3 Bid - Directional Bore 8" HDPE, <br />MH-1 to MH-9 <br />ADD <br />65 Directional bore 8” HDP, SDR 17 <br />DEDUCT <br />LF 1010 90.00 90,900.00 <br />66 8- PVC, SDR 35,10'-12' deep LF -400 33.00 (13,200.00) <br />67 8" PVC, SDR 35,12-14’ deep LF -515 34.00 (17,510.00) <br />68 8- PVC, SDR 35,14’-16’ deep LF -45 35.00 (1,575.00) <br />69 8" PVC, SDR 35,16’-18* deep LF -50 36.00 (1,800.00) <br />70 Lightweight aggregate <br />Total deduct <br />Total Alternate No. 3 <br />LF -1010 30.00 (30,300.00) <br />($64,385.00) <br />$26,515.00 <br />17 Directional bore 3” HDPE, SDR 11 LF 783 24.00 18,792.00 <br />65 Directional bore 8" HDPE, SDR 17 LF 446 90.00 40,140.00 <br />67 8" PVC, SDR 35,12*-14’ deep LF 115 34.00 3,910.00 <br />68 8" PVC, SDR 35,14*-16- deep LF 5 35.00 175.00 <br />70 Lightweight aggregate LF 40 30.00 1,200.00 <br />70294/co.wb1
The URL can be used to link to this page
Your browser does not support the video tag.