My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-1997 Council Packet
Orono
>
City Council
>
1997
>
08-11-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:00:11 AM
Creation date
8/1/2023 8:53:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JULY 21,1997 <br />(#21 - #2272 Wyatt Moe - Continued) <br />the lots where the lot line should be drawn. He asked what the Commission directed as far as <br />hardcover. <br />Lindquist said the hardcover noted should be satisfactory. He would like to see lots closer to <br />equal size. <br />Havvn said angling of the lot line should be satisfactory and did not believe the shoreline should <br />have to be changed. <br />Schroeder asked if the applicant would end up having more hardcover. Gaffron indicated that <br />other lots in the area average more than 25% hardcover. <br />Schroeder questioned whether the cabin let wvmld be considered new construction. Hurr said it <br />would but die lot was Uvo times the average size. Hawn was informed by Huir that the side yar <br />requirements would le met. Variances for lot area, width, and hardcover wrc dd be req^^d^ <br />The hardcover would be at about 35%. Lindquist thought the plans showed good progress or <br />♦he property. <br />Mrs. Moe said Uiey would like to build this fall and asked how the vacation <br />time frame. She was informed that application for vacation was required md the appli^' on <br />amended, which could be before the Planning Commission in August wth review of the lot <br />•eariangement. Approvals could be received at that time for vanm. lation md lot line <br />rearrangement for Council review ■ liieir August 25 meeting. The earliest time frame fo <br />receiving building approval w<- . d be September. <br />Hurr indicated that the property is handling the drainage. She also noted that the applicant is <br />aware of the sewer lines. <br />McMillan was informed by Gaffron thal the vacation would be a separate hearing ^ <br />done together with the p,.rk vacation. He indicated that the attractiveness ol the application the <br />vacation and rededication over the actual roadway. <br />Dave and Linda Walker, who live south of the Moe's, said they are in support of trading of the <br />land as they are currently cut off from Loma Linda and virtually landlocked. <br />Schroeder moved, Lindquist seconded, to table Application #2272 per Staff recommendation. <br />Vote: Ayes 6, Nays 0.
The URL can be used to link to this page
Your browser does not support the video tag.