My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-1997 Council Packet
Orono
>
City Council
>
1997
>
08-11-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:00:11 AM
Creation date
8/1/2023 8:53:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JULY 21,1997 <br />(#16 - #2267 John O'Sullivan for Adam Smith Company - Continued) <br />Ericson commented that he was unable to obtain a curb cut when he requested it. O'Sullivan <br />indicated that he has closed off one curb cut, had three approved, and currently has two curb cuts. <br />Ericson asked if it would be a common curb cut for both businesses when developed. Gaffron <br />said that would be the City Engineer's recommendation but not what is being proposed. <br />O'Sullivan noted that he has 400' of frontage. <br />Lindquist asked where the applicant is in the plan for development of the church site. O'Sullivan <br />said it would be in the fall or winter at the earliest time. He said he would support the temporary <br />location status but did not feel it would be the best option if only one curb cut is allowed. <br />Schroeder asked if his objection is due to the elimination of the parking spots. O'Sullivan said it <br />was. Schr^<?dcr asked how far north the access would have to be to gain a free right turn. <br />O'Sullivan .sv -J ;t would not occur. O'Sullivan said the County told him he would have to make <br />the best of ;1 jc intersection as it is. <br />Lindquist m- Navarre Lane was half vacated. Gaffron said it was vacated to the County ro d <br />right-of-way i he remaining portion is conceptually vacated pending the church site <br />development. Lindquist asked if the proposal can be accomplished with the vacation still being <br />conceptual. Gaffron said it could as it was still part of the public right-of-way. <br />Schroeder said he supports the temporary approval as it leaves options open. <br />Hawn said she is concerned with the traffic flow on the site. She feels the curb cut would <br />intensify the traffic flow. Hawn noted at the time of the restaurant approval, the applicant was <br />required to install a railing next to the doorway, install a sign, and place station markers for the <br />lanes. She indicated this was not done and compounds the safety concerns of the site. <br />O'Sullivan said the sidewalk reconfiguration resulted in the determination that no railing was <br />needed. Hawn asked who made that determination. Gaffron said he was not involved. <br />O'Sullivan said staff reviewed it and approved it. <br />Berg said she typically has seen cones located between the lanes. O'Sullivan said the cones were <br />not required. Hawn said she would have to review ihe minutes for the record. She had thought <br />they were to be immovable and permanent. <br />Hawn said she still has concerns regarding safety. She has viewed children running across the <br />parking lot and noted there was no sign for stopping in the walkway. Lindquist asked Hawn <br />what she would like to see done. Hawn showed where the sign and railing were to be located. <br />23
The URL can be used to link to this page
Your browser does not support the video tag.