Laserfiche WebLink
.747.40 <br />920.00 <br />US8.00 <br />190.00 <br />1.000.00 <br />800.00 <br />2,000.00 <br />600.00 <br />1.500.00 <br />1.000.00 <br />850.00 <br />639.00 <br />1.00 <br />4.658.00 <br />5.300.00 <br />2.000.00 <br />6.000.00 <br />625.00 <br />1.500.00 <br />11.215.75 <br />19.735.20 <br />8.819.00 <br />1.892.00 <br />2.904.00 <br />900.00 <br />207.00 <br />71 LF 595 0.01 <br />72 Remove existing CMP culvert LF 450 2.00 100 200.00 <br />73 Furnish and install 15 ” CMP culvert LF 450 12.00 201 2.412.00 <br />74 IS CMP flared end EA 30 100.00 12 1.200.00 <br />75 Riprap, Class III hand placed CY 12 30.00 8 240.00 <br />76 Sod with 4" topsoil SY 2 25 <br />77 Seed with topsoil, mulch and fertilizer AC <br />—' ^ ^ w <br />2 1.550.00 <br />78 Erosion control fence LF 1.000 2.50 1.000 2.500.00 <br />79 Wood fiber blanket SY 750 1.50 <br />80 Furnish and plant Evergreen Tree (Blue <br />Spruce) 6' high EA 6 225.00 <br />81 Furnish and plant shade tree (Sugar Maple) <br />4'diameter EA 6 500.00 <br />82 Remove and replace wood or chain link fence LF 600 15.00 <br />83 Remove and transplant bushes EA 12 75.00 <br />84 <br />• <br />Remove and transplant tree • Desiduous EA 12 150.00 <br />85 Remove and transplant tree • Coniferous EA 15 150.00 <br />86 Salvage and reinstall wood guard post EA 11 50.00 0.50 25.00 <br />Total Part 3 - Restoration SI 17.674.95 <br />Part 4 • Ice Arena Duplex Grinder Station <br />87 Duplex submersible grinder station LS 1 18.600.00 0.40 7.440.00 <br />88 2" HDPE, SDR 1 1 LF 1.160 6.00 1.095 6,570.00 <br />89 Connect to existing manhole EA 1 1.000.00 1 1.000.00 <br />90 2" HDPE 45 degree bends EA 2 50.00 <br />Total Part 4 • Ice Arena Duplex Grinder Station S15.010.00 <br />Part 5 - Lift Station 6 Renovation <br />91 Temporary controls, pumps and piping for <br />interim conveyance LS 1 2,000.00 <br />92 Lift station demolition LS 1 5,000.00 <br />93 New pumps, piping, valves, top hatch <br />and slab LS 1 35,000.00 <br />94 New control panel, base slab, dialer, and <br />miscellaneous electrical LS 1 24,000.00 <br />95 Sod SY 50 2.25 <br />96 8” Class 5 aggregate base TN 75 12.00 <br />97 3” thick bituminous driveway TN 30 45.00 <br />Total Part 5 • Lift Station 6 Renovation SO.OO <br />i IA139M3968V1EQUEST2.WB2