My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-1997 Council Packet
Orono
>
City Council
>
1997
>
08-11-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2023 9:00:11 AM
Creation date
8/1/2023 8:53:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br />t y)»( <br />A« <br />S) i 1 <br />ENUC » • <br />(fo^) <br />iWT <br />I <br />V ; <br />164 ^ <br />? <br />i <br />%c-s^*^7) <br />REQUEST FOR COUNCIL ACTION . <br />DATE: August 4, 19^f'Vo <br />ITEM NO.: <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Engineer's Report <br />item Description: Repair and Upgrade of Navarre Well Number 2 <br />removal of the well pump, cleaning of the well, and replacement of necessary par <br />the existing capacity of 275 gallons per minute. <br />Th, Navarre water system has two wells. The main well has a capacity of 1,000 0PM and the <br />SIS n^ter 2 has a capacity of 275 GPM. For the past 10 years, the avenge maxtmum <br />day witer H.mand has been 730,125 gallons per day or 507 gallons per mmute. Well <br />has approximately half of the capacity necessary to meet the average maxtnium ay ^ <br />When well number 2 was installed in 1972, it was never test pumped to ‘1'''^'°^ <br />capacity Since this well is short on the backup capacity to meet the n^tmum day <br />it makes sense to develop the well in an attempt to increase the capactty. Standard practice for t <br />ImSngtSr S conLtor to install a temporary pump to complete *is work. Test pumpmg <br />It hfghfr capacities can result in pumping of large quantities of sand and possible damap to *e <br />test pump Ve contractor installed a test pump and developed the well by test pumpmg. <br />'r“ro7uus .1st pumping indicate that a capacity of 500 GPM is <br />recommendation is to upgrade the well pump, to increase the capacity to 500 GPM m order t <br />HonHie the maximtun day demand. This will provide for firm redundant well capactty f <br />maximum day demand. <br />Unon removal of the pump it was discovered that the pitless unit was bent. This unit has ^n <br />taplace since the installation of the well in 1972, is corroded, and may have to be <br />near fiimre. Replacement of this unit in the future would require removal of P“ P- <br />Replacement of diis unit, at this time, before installation of the new pump would be advisable. <br />The cost for replacement of this unit is $5,000.
The URL can be used to link to this page
Your browser does not support the video tag.