Laserfiche WebLink
1 <br />mf i Bonestroo <br />Rosene <br />■ Anderlik & <br />\ Associates <br />Engineers & Architects <br />Bonesiroo. Rosene. Anderhk and Assoa*ites. Inc is an Affirmative Action/Equal Opportunity Employer <br />Principals: Otto G. Bonestroo. PE. • Joseph C Anderlik. PE. • Marvin L Sorvala. PE. • <br />Richard E Turner. PE. • Glenn R. Cook. PE. • Thomas E. Noyes. PE • Robert G Schunicht. PE • <br />Jerry A. Bourdon. PE • Robert W Rosene. PE and Susan M Eberlin. C PA. Senior Consultants <br />Associate Principals Howard A. Sanford. PE • Keith A. Gordon. PE. • Robert R. Pfefferle. PE. • <br />Richard W. Foster. PE • David O Loskota. PE • Robert C Russek. AIA • Mark A. Hanson. PE • <br />Michael T. Rautmann. PE • Ted K Field. PE • Kenneth P Anderson. PE • Mark R Rolfs. PE • <br />Sidney P. Williamson. PE. LS • Robert F Kotsmith <br />Offices: St, Paul. Rochester. Willmar and St. Cloud. MN • Mequon. Wl <br />May 15,1997 <br />Mr. Michael P. Gaffron <br />Assistant Building and 2^ning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, Minnesota 55323 MAV 1 6 1®^"^ <br />Re: Highview Site Sketch Plan <br />File No. 139-2240 <br />Dear Mike, <br />We have reviewed the sketch plan prepared for Jim Waters on the proposed Garden Lane Site, a subdivision <br />of PID Numbers 07-117-23-22-0008, 07-117-23-22-0007, 07-117-23-22-0017 and 07-117-23-21-0002, <br />located south of County Road 151 in the northwest quarter of Section 7. There are several issues that need <br />to be addressed relative to engineering matters and included with the plan. <br />1. Utilities: The current MUSA boundary includes Lots (8) and (7) and excludes Lots (17) and (2). It <br />appears that including Lots (2) and (17) into the MUSA area would be a logical assumption from an <br />engineering standpoint The slopes in these areas would make it difficult to find two suitable septic sites <br />on a two-acre lot A sanitary sewer will need to be extended north and west from Wildhurst Trail. Plans <br />and specifications should be prepared for the sanitary sewer, with as-built plans provided to the City upon <br />completion. Please note there is no municipal water service available for this area. Each lot will be <br />required to be served by a well. <br />2. Streets: City code specifies a maximum length of 1000 feet and ten units on a cul-de-sac. All streets <br />require a 30-MPH design speed and a 275-foot centerline radius. Neither of the two concept sketches <br />meets these requirements. No more than two units may be served from a private driveway. Private <br />streets serving three to seven units must be paved 24 feet wide, more than seven units require 28 feet <br />Public streets serving three to ten units must be paved 28 feet wide, more thaii ten units require 32 feet <br />All streets require 50 feet of right-of-way. Due to the existing topography on the site it may be <br />impossible to meet all of the code requirements. A shorter centerline radius could be mitigated by placing <br />curve ahead warning signs at both ends of the curve. It may be possible to shorten the cul-de-sac or limit <br />the number of units on tire private driveway on sketch 1 by constructing another cul-de-sac south between <br />lots 14 and 15. Or, construct driveway within the Highview Lane right-of-way from Wildhurst Trail <br />to lots 14 and 15. Public safety issue will need to be addressed. How will the fire department fight a fire <br />in this area without hydrants? Where is the nearest water supply to fill tankers? From a safety and access <br />standpoint, it would be very beneficial to make a street connection from West Branch Road (C.R. 151) <br />to this development. <br />3. Grading: Once an acceptable concept sketch has been prepared, a grading, drainage and erosion control <br />plan should be prepared that shows both the existing and proposed contours, building pad locations and <br />elevations, and erosion control measures to be used during construction. Plans should be prepared for <br />the street and storm sewer construction. <br />2335 West Highway 36 ■ St. Paul, MN 55113-3898 ■ 612-636-4600