My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-1997 Council Packet
Orono
>
City Council
>
1997
>
06-23-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:15:20 PM
Creation date
7/31/2023 4:08:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1•mm <br />Ua*■ * <br />MINIMUM MATERIAL REQUIRED FOR COMPLETE PRELIMINARY APPLICAtlON <br />1. Payment of fees (refer to "application fees" listed below. <br />2. Completed application fonn. <br />3. Preliminary plat information on Certificate of Survey, <br />4. Certified Property Owners List of ONMiers within 350* (you must obtain this list from Hennepin County Department of Finance A-603 <br />Govl Center 348-3271). -r .. r v r .• <br />5. As an addendum to this application, please attach a separate list of any other persons you wish notified of this application. <br />Zoning Official's Signature ______________________________________ --------------------------------------------- <br />MINIMUM MATERIAL REQUIRED FOR COMPLETE FINAL APPLICATION <br />1. Payment of fees (refer to Preliminary Subdivision Approval resolution and park fees if appicable). <br />2. Signed Certificate of Survey or mylar copies of formal plat. <br />3. Title opinion. <br />4. Easements, covenants, etc. <br />5. Developers Agreement and Letter of Credit. <br />Zoning Official's Signature ____________________________________ ---------- <br />I. APPLICATION FEES (Zoning Administrator to check (X] those which apply) <br />A. Application Base Fees: <br />^ Sketch Plan Review (Class 1, II & III) S250.00 <br />_____ Subdivision of a Lot Line Rearrangement $350.00 <br />Subdivision Application (Class 1 & II) $350.00 .. . <br />Preliminary Subdivision Application $375.00 + $25.00/lot (Class III & all non-residential) <br />_____ Final Plat Application (Class III) $200.00 <br />Legal Review and Filing: <br />Subdivision only $75.00 <br />Subdivision w/easements and covenants min. $200.00 <br />A A A ^ mm m <br />Totals <br /><ss-o <br />Park Ices (to be determined per Section 11.62) <br />Legal and Engineering Review Fees (as incurred) ,. .. n <br />Renewal of Class 1 and II Subdivision Application $200.00 (No change from original application) <br />^ __ t f •_?__A____I?__C'-nAA AA rKT/^ from oriatn^l AAnl <br />Renewal or uiass i ana ii duouivisiuu A\Hpii^auwu &---------------------rr ^ <br />’ Renewal of Class III, Preliminary Subdivision Application $200.00 (No change from original application) <br />■ Renewal of Final Class III Subdivision Application $150.00 (No change from original application) <br />B. Special Improvement Fees: <br />Proposed Private Roads $600.00 + $.50/lineal ft.; <br />_____ Proposed Public Roads $900.00 + $.50/lineal ft; <br />i;,i. ft. X .50 « $ <br />lin. ft. X .50 “ $. <br />Request for City to Accept Existing Private Road $900.00 <br />Proposed Sanitary Sewer Main Extension $250.00 + $25/stub <br />Proposed Watermain Extension $250.00 + $25/stub <br />Proposed Storm Sewer System (excluding culverts) $200.00 <br />On-Site System, Site Evaluation Review (applicable to rural subdivision applications) <br />$50.00/per lot x new lots <br />C. Flexible Application Fees/Misc. Fees <br />Variance $220.00 ($50.00 per each additional variance) <br />Easement Vacation Associated with Subdivision $100.00 <br />_____ PRD Application with Subdivision $30.00/Dwelling Unit <br />I <br />nie «Kjlicant hereby eerees to provide alt inforaiation required or requested by the Zoning Administrator, City Engineer, <br />JlltnS “tnS^^ Council necess ^to proeess this applieation and further agrees to pay all addtttonal fees establ.shed by <br />CSs ctp-.-.. Date ------------------------- <br />Owner’s Signatu Date <br />Anniirant must have all submittals into the City Office 25 days before the Planning Commission meeting. Planning Comrnission meetings <br />are held on the third Monday of each month. Applicants must be present at all scheduled review meetings of the ** <br />and Council. If an applicant is unable to anend a scheduled meeting, please make arrangements to have an authorized agent attend in y <br />place and to advise the Building & Zoning Office of this change prior to the meeting.
The URL can be used to link to this page
Your browser does not support the video tag.