My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-1997 Council Packet
Orono
>
City Council
>
1997
>
06-23-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:15:20 PM
Creation date
7/31/2023 4:08:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
# <br />rv <br />AnderlkC <br />mtamCAnMM <br />Owner City of Orono. P.O. Box 66. Crvstil Bav. MN 5S323 Date June 17.1991 <br />Contractor BuffaTo Bituminous, P.O. Box 337.2852 Co. Rd. 12 N. Buffalo. MN 35313 <br />Bond Co. <br />CHANGE ORDER NO. 2 <br />1996 OLD CRYSTAL BAY ROAD TRAIL IMPROVEMENTS <br />FUe No. 13985 <br />Dcscriptfon of Work <br />Part A of this change order provWes for removal and regrading of the existing driveway off Willow Drive <br />into the Otten Nursery. <br />Part B of this change order provides for concrete curb and gutter to correct a drainage problem and <br />control traffic at the new trail at the City Hall entrance. The following items ate to be added to the <br />contract. <br />No.Item Unit <br />Contract Unit <br />Quantity Price <br />Total <br />Amount <br />Part A <br />Saw bituminous pavement <br />Remove bituminous <br />Remove curb <br />Salvage existing Class 5 <br />Class 5, aggregate base <br />Type 41 bituminous for driveway <br />Common excavation <br />Bituminous material for tack <br />B618 concrete curb and gutter <br />LF <br />SY <br />LF <br />SY <br />TON <br />TON <br />CY <br />GAL <br />LF <br />130 2.00 <br />275 2.50 <br />120 5.00 <br />275 2.00 <br />75 12.00 <br />50 45.00 <br />SO 20.00 <br />15 2:00 <br />120 12.00 <br />$260.00 <br />$687.50 <br />$600. <br />$550. <br />$900. <br />$2,250. <br />$1. <br />$30.00 <br />$1.440.00 <br />I • • <br />TotalPartA OTTFM $7,717.50 <br />PartB <br />B618 concrete curb and gutter <br />Type 41 bituminous for driveway <br />Total Part B C H V <br />IP <br />TON <br />):7K\V^WiCiV <br />60 12.00 <br />8 45.00 <br />$720.00 <br />$360.00 <br />$1,080.00 <br />Total Part A <br />Total Part B <br />Total Change Order No. 2 <br />$7,717.50 <br />$1,080.00 <br />$8,797.50 <br />70294/bO.Wb1 .; .....'i “............................. <br />- <br />•; <br />• • <br />/* V. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.