Laserfiche WebLink
COUNCIL MEETINQ <br />JUN 2 3 1997 <br />REQUEST FOR COUNCIL ACTION <br />cmroFORONo <br />DATE: June 23, 1997 <br />ITEM NO.= AO <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Engineer's Report <br />Item Description. Change Order No. 3 North Lake Sanitary Sewer Project <br />This project requires the installation of storm sewer pipe in several steep areas adjacent to Long <br />The pipe material for this storm sewer will be changed from concrete pipe to high density <br />polyethylene pipe. This will reduce the amount of disturbed areas on the steep slopes as the <br />contractor will be able to use smaller equipment for pipe installation. The quality and life span <br />of the replacement pipe is equal to the original pipe specified. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve Change Order No. 3, North Long Lake/Long Lake Country Club Sanitary <br />Sewer project, in the amount of a $737.00 deduction