My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-1997 Council Packet
Orono
>
City Council
>
1997
>
06-09-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:07:47 PM
Creation date
7/31/2023 3:58:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />Cost Estimate <br />! i <br />’i Oty of Plymouth <br />1 Ftmddlc Rodd Peconstruafon <br />As a fee for design services, we propose to complete the design <br />elements of the project on a lump-sum basis. Assuming a project <br />construction cost range of $800,000 to S1.2 million, our proposed fee <br />for preliminary engineering and final design Is based on a project <br />construction cost of $ 1 million. <br />Phase I — Preliminary Engineering (Feasibility Study) = $25,200 <br />If an environmental assessment Is required, those services would be <br />provided for additonal compensation on an hourly basis. <br />Phase II — Design Plans/Bid Assistance = $47,000 <br />These costs do not Include materials testing or geotechnical analysis. We <br />would use subconsultants for these tasks or use a firm chosen by the <br />City. The estimated cost for these services Is $ 1 1,000. <br />We propose to complete the construction phase (Phase III) on an hourly <br />basis. Our experience Indicates that costs may range from $75,000 to <br />$ 1 1 0,000 for a project of this type and complexity, based on full-time <br />Inspection. Our billing rate schedule Is attached.
The URL can be used to link to this page
Your browser does not support the video tag.