My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-1997 Council Packet
Orono
>
City Council
>
1997
>
06-09-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:07:47 PM
Creation date
7/31/2023 3:58:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r r•a <br />March 5,1997 CITY Of- <br />PLYMOUTH <br />m 0 6 <br />C\TV OF ORONOMr. Shawn Gustafson <br />BONESTROO, ROSENE, ANDERLK <br />AND ASSOC., INC. <br />2335 W. Trunk Highway 36 <br />St. Paul, MN 55113 <br />SUBJECT: FERNDALE ROAD IMPROVEMENT PROJECT <br />CITY PROJECT NO. 607 <br />Dear Shawn: <br />The City of Plymouth and the City of Orono have both included in our construction <br />program for 1998, the reconstruction of Femdale Road from County Road 6 to Highway <br />12. For most of this segment of road, the city limits line between the two cities is on the <br />centerline of the street. About the southerly 1000-feet is totally within the City of <br />Orono. This will be a joint project for both cities and Orono has requested that <br />Plymouth be the lead agency. <br />To allow ample time for the planning for this project, we are proposing to get imderway <br />this Spring. During 1997, planning can be completed, plans prepared, approvals <br />received, contract awarded, and construction can begin when weather permits in 1998. <br />Since your firm has been a consultant for both cities, I am requesting a proposal for <br />project engineering fron your firm. The proposal should defme a scope of services and <br />cost estimate for the following three categories: <br />• Preliminary Engineering Report. <br />• Plans and specifications and award of contract. <br />• Construction services. <br />I would anticipate three public information meetings as part of the project. Two would <br />be associated with the Preliminary Engineering Report and one at the completion of the <br />construction plans. A presentation of the preliminary report would also need to be made <br />to each City Council. <br />r I <br />C:\ENGU>R01ECTS\«77U.TRS\CUSTAFSN.D0CPLYMOUTH ^eautifuCTtace To Live <br />3400 PLYMOUTH BOULEVARD • PLYMOUTH. MINNESOTA 55447-1482 • TELEPHONE (612) 509-5000
The URL can be used to link to this page
Your browser does not support the video tag.