My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-1997 Council Packet
Orono
>
City Council
>
1997
>
06-09-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 4:07:47 PM
Creation date
7/31/2023 3:58:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V ; <br />J <br />MINUTES OF TEIE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON MAY 27,1997 <br />(#18 > County Road 19/Tonkaview Drainage Situation - Continued) <br />Kelley, noting the runoff problem having been created by homes built upstream, asked <br />what position the City can make regarding this increase in flowage. Code states that <br />construction of new or improved residences cannot alter the flow of runoff leaving their <br />property. He suggested a pond be built on those properties or request assistance in <br />building the pond fi-om those home owners. Gappa said the lots had been previously <br />platted and have a steep incline that would prevent the construction of ponding areas. <br />Kelley indicated that a stormwater management plan would enable the City to seek <br />restitution fix>m owners of residences upstream creating additional runoff. <br />Jabbour said the stormwater management plan shows how water is managed and how <br />stormwater projects can be paid as well as fund accumulation. <br />Goetten said the plan would also inform the City where ponds should be built. <br />Kelley questioned whether the cost of the project can be assessed to these home owners. <br />Barrett indicated that the City would have to demonstrate the benefit. <br />Jabbour said if a stormwater plan had been in place, it could have informed the City <br />where the pond should be built and how it would be assessed. <br />The cost of the project is $51,780 and $10,000 proposed for the easement. <br />Gappa said the stormwater fund would receive contributions fi’om all property owners. <br />He views this project as the number one priority in viewpoint of stormwater management. <br />Flint inquired what the triggering mechanism would be for a pond requirement if a <br />stormwater management plan was in effect, whether a subdivision or building pemut. <br />Gappa smd each home is currently evaluated and subdivisions are reviewed as a whole. <br />Jabbour indicated that the City and water will be studied and re^onal ponding areas <br />determined. Residents upstream can make contributions to a pond rather than build a <br />NURP pond. Jabbour said developers would prefer that option. The fund would be <br />levied by on-going fees and by new development. It is currently micro-managed by <br />individual issues instead of proactively. Jabbour said building permits trigger the action. <br />Gappa noted that if a pond cannot be built on the particular property, a contribution <br />would be made to a pond downstream. <br />Mr. Bessesen noted that if the homes upstream had been required to contain water on <br />their properties and not add to flowage, there would not be the problem that is occurring <br />today. He questioned how excess runoff is controlled. He was informed that while there <br />are structural coverage limitations, there are no hardcover controls on non-Iakeshore <br />properties.
The URL can be used to link to this page
Your browser does not support the video tag.