My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-1997 Council Packet
Orono
>
City Council
>
1997
>
05-27-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:53:31 PM
Creation date
7/31/2023 3:49:30 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05"27-97 14:14 <br />05/23 15:29 1997 P90M: <br />CITY OF ORONO <br />FhEGPE hIIE' BEMI.QN - 8124730510 <br />6124730510 TO: 6123363026 <br />^ 6124730510 C: Z22/97 <br />1 10. 243 ’ C?07 <br />PAGE: fl <br />14:32 0 :06/20 NO:910 <br />RR>1B*1 zones. <br />C. The potential negative visu»'J impacts of a single oversize accessory <br />structure cdi|^ be mitigated more readily than those of the multiple <br />structures wfcuch would be nccessaiy to serve the golf courso use if the <br />variance is opt granted. <br />D. The appUcaiiis have demonstrated that the negative visual impact* of <br />the proposed:structure can be midgaled by screening with bems and <br />tree planlingjt, tu result in no visual impact on neighboring propertie.s <br />or roadways. <br />E. A combined total of approximately 12,000 s.f. of accessory buildings <br />is not excessive given the 200*acrc area of the total site. <br />8. Variances requested for impacts to City-designated wetlands include: <br />- Excavalion of a 0.53 acre portion of the 0.79 acre Wetland #2 to <br />create a NU’itP pond, with an additional 0.16 acre of upland being <br />converted to wetland. The City-required 26' buffer will be maintained. <br />- Filling of a (»,88 acfO portion of 1.92 acre Wetland #5 to create part <br />of Fairway excavation of a 0.84 acre portion of the wetland to <br />create a NUBIP pond, and excavation of 0. t S acres of upland to create <br />new wetland, TTie required 26' setback will be maintained around the <br />NURP basin. <br />Filling of a 0K)7 acre portion of 0.70 acre Wetland #12 to create port <br />of Fairway #7. A 26' buffer will be maintained except for along the <br />260' wetlanddtll line. <br />Excavation of 0.57 acres of upland adjacent to 3.50 acre Wetland #15 <br />cKpoad-tlda wctlemd-to 0.57 acres. The 2o' buficr will be <br />maintained. <br />Page 3 of 16
The URL can be used to link to this page
Your browser does not support the video tag.