Laserfiche WebLink
2. <br />3. <br />4. <br />Good boulder to boulder contact shall be established during construction. If the boulders <br />come loose in the future, they shall be replaced in their original position. <br />If the bouldere do not remain in place, then the boulders shall be restrained with heavy gauge <br />wire mesh placed in front of the boulders and pinned into the hillside with earth anchors. <br />Steel bearing places or similar devices shall connect the wire mesh to the earth anchors. <br />If the boulders do not retain earth after reinforcement with wire mesh and earth anchors, the <br />conditional use permit shall be amended and the concrete retaining wall referenced in the <br />3/20/97 letter from GME consultants shall be constructed. <br />5.The boulder retaining wall shall be annually reviewed by the Building Official to determine <br />compliance with the conditional use permit. <br />#2222 Joseph Vochko <br />2925 Casco Point Road <br />4/21/97 <br />page—4