My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-1997 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1997
>
05-12-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:45:10 PM
Creation date
7/31/2023 3:40:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITYof ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 2948 <br />4 <br />•t • <br />4. All of the 12 lots shall achieve access via an interior private <br />roadway. No direct access onto Watertown Road will be allowed for an <br />individual lot owner. <br />5. The applicant has filed the revised preliminary plan with the <br />Minnehaha Creek Watershed District. All conditions of MCWD permit <br />must be met by applicant and included with final drainage, grading and <br />erosion control plans. <br />6. In a memo dated March 13, 1991, Michael P. Gaffron, Assistant <br />Planning and Zoning Administrator, confirmed that all 12 lots have <br />been tested and found to have suitable areas for on-site septic <br />development. Since that memo, Mr. Gaffron has received verbal <br />confirmation from the on-site evaluator that drainfields can be <br />shifted or relocated on Lot 2, Block 2 and Lot 5, Block 3 to meet the <br />on-site septic standards of the City. <br />7. The proposed configuration and overall design of the lots within <br />the plat finds that each lot satisfies the lot standards of the RR-IB <br />Zoning District requiring no variances with the granting of the <br />approval of this subdivision. Each lot can be developed as a <br />residential unit without the need for future variances. <br />8. The subdivider has provided a future access corridor to the east <br />and shall be responsible for developing the roadway to the eastern <br />boundary providing a temporary cul-de-sac. <br />NOW, THEREFORE BE IT RESOLVED, that based upon one or more of the <br />findings noted above, the City Council of the City of Orono hereby approves <br />the revised preliminary plat of Crystal Creek per plat survey dated <br />February 26, 1991, revised March 18, 1991 by Edward H. Sunde, a registered <br />land surveyor under the laws of the State of Minnesota of Sunde Land <br />Surveying, Inc., subject to the following conditions: <br />Pag?' 2 of 8
The URL can be used to link to this page
Your browser does not support the video tag.