My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-1997 Council Packet
Orono
>
City Council
>
1997
>
05-12-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:45:10 PM
Creation date
7/31/2023 3:40:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#2209 - Spring Hill Golf Club <br />May 8,1997 <br />Page 8 <br />E. Land Alteration CUP <br />STAFF & PC RECOMMENDATION: The following should be required as general <br />conditions of approval: <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />The City may limit the hours during which grading activity may occur so as not to <br />be a disturbance to the neighborhood. The specific hours should be a point of <br />discussion prior to final resolution approval. <br />Applicant shall take whatever steps are necessary to minimize odors and dust during <br />the construction process. <br />Given the existing condition of Spring Hill Road, it would be reasonable and <br />prudent for the City to limit construction traffic to the existing Co. Rd. 6 access. <br />The developer shall maintain local roads in a clean condition. <br />The City shall retain the ability to limit construction traffic on local roads if weather <br />conditions result in an unsafe situation, although most grading work is expected to <br />be completed in the summer months where icy conditions are not a concern. <br />Applicants shall adhere to the Best Management Practices for Protecting Water <br />Quality in \ Irhan Areas. Applicants have included erosion and sedimentation control <br />measures on their grading plan which will be reviewed by the City Engineer (should <br />adhere to erosion control measures noted in May 6 Bonestroo letter).
The URL can be used to link to this page
Your browser does not support the video tag.