My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-1997 Council Packet
Orono
>
City Council
>
1997
>
04-28-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:38:03 PM
Creation date
7/31/2023 3:28:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S-P TESTING, INC.Steven B. Schirmers • MPCA Cert.No. 627 <br />951 Katydid Lane NE • St. Michael, MN 65376 • (612) 497-3566 <br />FAX (612) 497-5011 <br />State License #394 <br />Revised March 18,1997 <br />October 28,1996 <br />CITY OF <br />ORONO <br />George Adams 600 Big island <br />Tom Robb 570 Big Island <br />Jim Figger 580 Big Island <br />Orono, Henn. Co., MN <br />JudESO^B <br />mar. 2 o; 199Tj <br />jt ^ <br />A site evaluation was completed on these properties for the existing on-site sewage <br />treatment systems supporting the existing cabins. The existing systems are classified <br />as failing due to not meeting the 3* separation from the saturated soil (mottled soil) or <br />lack of system. The existing tanks are old, either metal or block type and will need to be <br />abandoned, pumped and filled with soil. A new system will need to be installed. <br />This on-site sewage treatment cluster system is designed for a Type 3, 3 bedroom 218 <br />gal/day each cabin totaling 654 gal/day, in accordance with the Minnesota Pollution <br />Control Agency Chapter 7080 and local ordinances. An easement agreement will be <br />required by the city. The agreement will require a maintenance schedule for maintaining <br />the tanks, and shared electrical costs, etc. A water meter v/ill need to be installed in <br />each cabin to monitor the dally water use and to be recorded with the property. The <br />system will be 5' from the property line and up to the road easement, this will need <br />approval from the city. Approval will also be needed for a tank to be 5' from the Robb <br />cabin to stay out of a low area. <br />The soils on this site are SCS soils mapped - HbC - Hayden loam. The seasonally <br />saturated soils were located at 5'10". The bottom of the treatment area must be located <br />at least 3' above the seasonally saturated soils. A standard gravelless 10" diameter <br />trench system may be installed. <br />The soils at a depth of 30" have a percolation rate averaging 10.4 mpi. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.