Laserfiche WebLink
e. The boulder retaining wall shall be annually reviewed <br />by the Building Official to determine compliance with <br />the conditional use permit.. 1 <br />2.A hardcover variance to allow for a boulder retaining wall and <br />stairway in the 0'-75’ setback to increase hardcover from 220 sq.ft. <br />(4.8%) to 390 sq. ft. (8.6%). A 8.6% variance is required. <br />COUNCIL ACTION <br />REQUESTED: To approve the enclosed resolution. <br />I <br />••V