Laserfiche WebLink
6.Protection of drainfield sites via fencing shall be placed prior to construction of <br />roadway and drainage improvements, and shall remain in place until residences <br />are completed on all four lots. <br />7. Outlot A shall be given a new road name, and address assignments for Lots 1, <br />2, 3 and 4 shall be consistent with the grid system. <br />8. Applicant shall designate Orono wetlands as drainage easements on the plat and <br />grant flowage and conservation easements. <br />9. Applicant shall create maintenance covenants for road and drainage <br />improvements. <br />10. No building permits shall be issued until a satisfactory road base and and <br />drainage improvements are installed per City Engineer's approval. <br />FINAL PLAT SUBMITTALS <br />The following list of final submittals must be submitted to the Zoning Administrator two <br />weeks prior to the regularly scheduled Council meeting on the second and fourth Mondays of <br />each month. Required submittals are as follows: <br />1.Record plat drawings in the form of two (2) mylar copies and one (1) copy <br />reduced to 1" = 200'. Drawing to include: <br />A.Lot lines platted per preliminary survey by Coffin and Gronberg, Inc. <br />dated February 21, 1997, most revised date February 28, 1997, attached <br />as Exhibit A hereto. <br />B.Dedication of "drainage and utility easements" 10' wide along all <br />perimeter property lines and 5' each side of internal property lines. <br />C.Designation and dedication of the Orono designated wetlands as "drainage <br />easements" on the plat. <br />Page 3 of 5 <br />d <br />£