Laserfiche WebLink
BRACKETTS POINT <br />SANITARY SEWER IMPROVEMENTS <br />ORONO, MINNESOTA <br />March 10,1997 <br />I.Extension of sanitary sewer service to the Bracketts Point area. The trunk <br />system would connect to the existing forcemain on County Road 15 <br />(Shoreline Drive). <br />n.Estimated Project Cost Alternate <br />Sanitary Sewer Laterals $141,894 $174,650 <br />Street Reconstruction 165,363 108,334 <br />Lift Station and Forcemain 117.532 117.532 <br />Totol $424,789 $400,516 <br />Estimated Cost / Unit <br />Estimated Cost <br />$424,789 <br />Number of Services Cost / Service <br />15 $28,319 <br />The cost per service using the alternate design would be $26,701 and does <br />not include operation and maintenance costs of the grinder stations.