Laserfiche WebLink
BONESTROO AND ASSOCIATES <br />• • • • <br />^ 612 6361311 02/20/97 08:38 0 :1A/1A N0:918 <br />WBtw Main <br />PRELIMINARY COST ESTIMA TE <br />EST. UNIT EST. <br />ITEM UNIT QUANTITY PRICE COST <br />6" DIP water main LF 20 20.00 $400 <br />8" DIP water main LF 20 25.00 500 <br />12" DIP water main LF 575 30.00 17,250 <br />12" BV & box EA 3 800.00 2,400 <br />8" GV & box EA 2 600.00 1,200 <br />6" GV & box EA 1 400.00 400 <br />Cast iron fittings LB 2,000 1.50 3,000 <br />Connect to existing 8" DIP EA 1 500.00 500 <br />Seeding w/topsoil, mulch, fertilizer AC 1.00 2,500.00 2,500 <br />Diivewav replacement SY 50 40.00 2,000 <br />Estimated Construction Cost <br />+5% contingencies <br />+20% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />l3y(Jl2NAFF.WB2 A-2 <br />$30,150 <br />1,608 <br />$31,658 <br />6,332 <br />$37,989 <br />1.899 <br />$39,866