Laserfiche WebLink
BONESTROO AND ASSOCIATES ©612 6361311 02/20/97 08:38 0 :09/14 NO:918 <br />IV. Water Main <br />Tlic proposed water niaitt for the Orono Ice Arena is shown on Figure 3. A review of (he <br />project site indicates the route shown on the figure is recommended from u construction <br />standpoint. <br />The existing eight-inch water main is located approximately 6(K) feet south of the Orono <br />Icc Arena site on Old Crystal Bay Road. The existing eight-inch line would be extended 20 feet <br />to the north; and frojii that point t(» .‘>7.3 feet north, 12-inch water main would he installed. Where <br />the 8-inch and 12-inch water mains join, an 8-inch tee and plug would be installed to provide <br />future water service to the east The 12-inch water main would provide adequate capacity to <br />serve any future development. The Orono Ice Arena would be served by a six-inch water main <br />extended to the property line. <br />The project will generally be obstructed in the right-<*f-way. The alignment sh<^wn on <br />Figure 3 may require some permanent and construction casements from the Orono Icc Arena, <br />Sanitaf'^ iVu e*/ tiful Hii/rr Main hnpravfnu*nts <br />4