Laserfiche WebLink
CITY OF ORONO <br />REGULAR COUNCIL MEETING <br />MINUTES FOR FEBRUARY 10, 1997 <br />ROLL OPQ <br />The Council met on the above mentioned date with the following members present: <br />Mayor Gabriel Jabbour, Council Members J. Diann Goetten, Charles Kelley, Barbara <br />Peterson, Richard Flint, and Charles Kelley. <br />Representing Staff were City Administrator Ron Muerse, City Attorney Tom Radio, <br />Building and Zoning Administrator teanne Mabusth, Planner/Zoning Administrator <br />Elizabeth Van Zomeren, Public Services Director Greg Gappa, City Engineer Glenn <br />Cook, and Recorder Sherry Frost. <br />Mayor Jabbour called the meeting to order at 7:00 p m. <br />(#1) OATH OF OFFICE - COUNCIL APPOINTEE, RICHARD FLINT <br />City Administrator Moorse administered the Oath of Office of Council Member to <br />Richard Flint. Mayor Jabbour welcomed Flint to the Council. <br />(#2) RESIDENTS OF ORONO LANE AND COUNTY ROAD 15 INTERSECTION <br />RECONSTRUCTION INFORMATION AND COMMENTS - RESOLUTION NO. <br />3840 <br />Moorse asked Bruce Polaczyk of Hennepin County to present information on the site <br />distance concerns related to the intersection ofOrono Lane and County Road 15. <br />Polaczyk related the existing design of the intersection and the proposed design. He said <br />discussions over the intersection included neighbor concerns, visual impacts, wetlands, <br />safety, and cost. <br />The e.xisting site distance of the intersection according to Polaczv k is 49 meters or 150' <br />allowing for a 2-1/2 second reaction time. The proposed design wouid have a site <br />distance of 108 meters or 355'. The negative side to the proposed design is its impact <br />into the hillside requiring removal of trees and brush. 1 he County is proposing a 150' <br />long retaining wall to reduce the impact of ihe construction line to the side of the hill. It <br />would have an impact on a total of 3300 s.i or i/lOth acre. Polaczyk noted that design <br />requirements had to be met including a clear zone and site distance requirements.