My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-1997 Council Packet
Orono
>
City Council
>
1997
>
02-24-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:04:10 PM
Creation date
7/31/2023 3:02:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S <br />REQUEST FOR COUNCIL ACTION <br />DATE; February 24^y9997 <br />ITEM NO.= /O <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed: <br />7 <br />Agenda Section: <br />Engineer's Report <br />Item Description: Change Order No. 2 Lift Station No. 28 Renovation <br />This contract is for the renovation of Lift Station No. 28. The installation of a Sensa Phone <br />Express Dialer System in the lift station was included as part of the project. This dialer system <br />will place a call to the pager of the on call public works employee in the event of a lift station <br />malfunction. This will provide for immediate notification cf public works personnel for a <br />quicker response time, thus reducing the potential for property damage. <br />This change order will provide for a Sensa Phone Express Dialer .System for installation in Lift <br />Station No. 6 which is located along Casco Point Road. The amount of this change order is <br />$3,856.47. The Contractor and Boonestro Engineers were provided verbal authorization for this <br />change order by the previous Public Works Director, so the contractor has already purchased the <br />equipment. However, the equipment has not been installed yet. My understanding is that the <br />contractor. Ford Construction of Long Lake, has completed excellent work for the City on .several <br />projects, so it was decided to have him install this additional equipment through the change order <br />process for the existing lift station rehabilitation contract. <br />Lift Station No. 6 is a critical lift station with a limited time for response oefore basement <br />flooding occurs. There have been past incidents of flooded basements from lift station <br />malfunctions. Lift Station No. 6 is one the oldest lift stations in the City and is difficult to repair <br />because of the station design. Rehabilitation of this lift station has been approved for this <br />summer to provide for a more dependable station that will be easier to service and repair. <br />The tributary area to this lift station also experiences infiltration and inflow problems which <br />increase the flow into the system further reducing the amount of time available before property <br />damage occurs in the event of a lift station malfunction. We are concerned that the heavy snow <br />this winter could compound the I & I problem for this lift station in the spring. The immediate <br />installation of a temporary dialer system in the Lift Station No. 6 will provide an added level of <br />protection for this station this spring and summer until after renovation is completed The <br />renovated lift station will include a dialer system installed within the new control system which <br />will provide permanent protection for the this facility. The temporary dialer system can than be <br />moved to either Lift Station No. 7 or 8 and installed to provide permanent protection for one of <br />these stations. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve Change Order No. 2 , Lift station No. 28 Renovation for $3,856.47.
The URL can be used to link to this page
Your browser does not support the video tag.