My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-1997 Council Packet
Orono
>
City Council
>
1997
>
02-24-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 3:04:10 PM
Creation date
7/31/2023 3:02:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Part B - Storm Sewer • MSAP 152-102-12 <br />2501.515 18" RC pipe apron w/trash guard EA 1 $750.00 1 750.00 <br />2503.541 18” RC pipe culvert. Class V LF 120 31.00 120 3,720.00 <br />SP-2 Construct catch basin. Design SP-2 EA 1 750.00 1 750.00 <br />SP-3 Construct manhole. Design SP-3 EA 1 1,017.00 1 1,017.00 <br />2511.501 Random rip rap. Class 3 CY 4 86.00 <br />Total Part B - Storm Sewer $6,237.00 <br />Change Order No. 1 <br />2105.523 Common borrow CY 1,215 4.50 1,215 5,467.50 <br />2211.501 Agg. base Cl. 5, 100% crushed w.ilk TN 128 7.65 128 979.20 <br />2331.518 Type 41 bit. mix walk TN 63 18.70 63 1,178.10 <br />2503.541 18” RC pipe culvert. Class 5 LF 40 31.00 40 1,240.00 <br />SP-2 Const, catch basin, design SP-2 EA 1 750.00 1 750.00 <br />Total Change Order No. 1 $9,614.80 <br />Total Part A - Old Crystal Bay Rd. MSAP 152-102-12 49,706.89 <br />Total Part B - Storm Sewer- MSAP 152-102-12 <br />Total Change Order No. 1 <br />Total Work Completed to Date <br />6,237.00 <br />9,614.80 <br />$65,558.69 <br />1 <br />I3966\requcst.wb2
The URL can be used to link to this page
Your browser does not support the video tag.