Laserfiche WebLink
Lift Station and Forcemain <br />PRELIMINARY COST ESTIMA TE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />Lift station EA 1 75,000.00 75,000 <br />4' PVC, DR25 forcemain LF 600 12.00 7,200 <br />T ransplant tree EA 1 5,000.00 5,000 <br />Sodding with topsoil SY 200 2.50 500 <br />Connect to existing force main EA 1 5,000.00 5,000 <br />Estimated Construction Cost <br />+5% contingencies <br />•f15% design, inspection, admin <br />■1-5% capitalized interest & bonding <br />Total Estimated Cost <br />I3990APP.WB2 <br />$92,700 <br />4,635 <br />$97,335 <br />14.600 <br />$111,935 <br />5,597 <br />$117,532