My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1997 Council Packet
Orono
>
City Council
>
1997
>
02-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:49:19 PM
Creation date
7/31/2023 2:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lift Station and Forcemain <br />PRELIMINARY COST ESTIMA TE <br />ITEM UNIT <br />EST. <br />QUANTITY <br />UNIT <br />PRICE <br />EST. <br />COST <br />Lift station EA 1 75,000.00 75,000 <br />4' PVC, DR25 forcemain LF 600 12.00 7,200 <br />T ransplant tree EA 1 5,000.00 5,000 <br />Sodding with topsoil SY 200 2.50 500 <br />Connect to existing force main EA 1 5,000.00 5,000 <br />Estimated Construction Cost <br />+5% contingencies <br />•f15% design, inspection, admin <br />■1-5% capitalized interest & bonding <br />Total Estimated Cost <br />I3990APP.WB2 <br />$92,700 <br />4,635 <br />$97,335 <br />14.600 <br />$111,935 <br />5,597 <br />$117,532
The URL can be used to link to this page
Your browser does not support the video tag.