Laserfiche WebLink
BONESTROO AND ASSOCIATES ^612 6361311 02/06/97 14:02 0 :13/17 NO:654 <br />Lift SMton mnd Forc*mmln <br />PRELIMINARY COST ESTIMATE <br />ITEM UNIT <br />EST. UNIT <br />QUANTITY PRICE <br />EST. <br />COST <br />Lift station EA 1 90,000.00 ^90,000 <br />4* PVC, DR25 forcemain <br />4" PVC, DR 25 forcemain- <br />LF 1,250 12.00 15,000 <br />directional bore LF 60 40.00 2,400 <br />Connect to MCES forcemain EA 1 5,000.00 5,000 <br />Transplant tree EA 2 300.00 600 <br />Sodding with topsoil SY 650 2.00 1,300 <br />Seeding wAopsoll, mulch, fertilizer AC 0.50 3,000.00 1,500 <br />Landscaolna LS 1 3.000.00 3.000 <br />Estimated Construction Cost <br />contingGncies <br />+15% design, Inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />$118,800 <br />5.940 <br />$124,740 <br />16,711 <br />$143,451 <br />7,173 <br />$160,624 <br />I.19QIAPP.WB2 <br />4