My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1997 Council Packet
Orono
>
City Council
>
1997
>
02-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:49:19 PM
Creation date
7/31/2023 2:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
exemptions contained in the Act and find that, no exemptions apply. The project must be <br />certified by the LGU as having complied with the provisions of the Act. <br />Any wetland impacts must be replaced or restored, at a minimum ratio of 2 acres of <br />replacement for every 1 acre impacted. These mitigation activities must occur within the same <br />watershed as the impact occurs. The act also mandates that restoration or creation of <br />replacement wetlands only be considered after an applicant has demonstrated that the impacts <br />can not be avoided, further minimized, corrected or eliminated over time. This requirement <br />is essentially the same as the U.S. Army Corps of Engineers permit process. <br />During the final design process efforts should be taken, whenever possible, to avoid and <br />minimize w^etland impacts. By utilizing this approach wetland replacement costs will be kept <br />to a minimum and any additional permitting will be more easily facilitated. In addition, this <br />strategy should result in a greater level of project acceptance. <br />SCHOELL Gl Maoson, Inc. Mkmnetonk A, Miimimesot A
The URL can be used to link to this page
Your browser does not support the video tag.