Laserfiche WebLink
Cosiderable efforts have been made by the Minnehaha Creek Watershed District to improve <br />the water quality of Long Lake, with over $2.2 million spent in an effort in recent years. During <br />the design of the course, special attention has been, and wilt continue to be, given to <br />improving runoff quality from the present condition. The nutrient budget analysis indicates <br />significantly reduced levela from the existing condition (see Table 2). The stormwater <br />treatment ponds are intended to be constructed to treat the runoff from the golf course. The <br />runoff through the wetland complexes to Long Lake is routed through wet detention ponds <br />prior to discharge to Long Lake. The irrigation pond in the center drainage will collect runoff <br />for reuse as im'gation, thereby further reducing potential nutrient loading and reducing im'gation <br />needs. Since there is little impervious area and the flow must pass across well vegetated <br />grassy areas, it is anticipated that the golf course will not be a significant loading source. <br />Water quality and quantity control will be provided by three NURP basins designed for both <br />on-site and off-site drainage areas. The NURP basins are located along Spring Hill Road on <br />the upstream end of the existing culverts. Outlet structures are placed at the existing culverts <br />to control the flow rates. The ponds are sized to meet Minnehaha Creek Watershed District <br />and City requirements for NURP basin design. <br />The drainage was analyzed using stormwater modeling software based on Soil Conservation <br />Service methodologies. The modeling was set up to route 100-year, 10- year and 1-year <br />design storms through the existing wetlands, mitigation wetlands, NURP basins and road <br />culverts. <br />The proposed construction of the fairways, greens and tees will increase the volume of runoff <br />by 120% to 175% over the existing conditions. By using the detention storage available in the <br />wetlands, mitigation areas and NURP basins, the additional volume is controlled and the <br />proposed runoff rates leaving the Site are reduced to below the existing rates. <br />The existing and proposed runoff rates at the three major culvert crossings on Spring Hilt Road <br />are presented in Table 1. <br />TABLE 1 <br />RUNOFF RATES TO LONG LAKE <br />SPRING HILL RD <br />CULVERT <br />EXISTING CONDITIONS PROPOSED CONDITIONS <br />100 Yr.10 Yr.1 Yr.100 Yr.10 Yr.1 Yr. <br />15" CMP (NURP Basin 1)23 cfs 9 cfs 0 cfs 4 cfs 2 cfs 0.2 cfs <br />36" RCP (NURP Basin 2)23 cfs 11 cfs 1.4 cfs 16.5 cfs 11.5 cfs 0.4 cfs <br />42" RCP (NURP Basin 3)57 cfs 28 cfs 3 cfs 29 cfs 6.5 cfs 0.9 cfs <br />The roadway culvert crossings on County Road 6 arjd Spring Hill Road were also included in <br />the storm water flow rate modeling. Based on the results of the flow rating, these culverts are <br />capable of handling up to 100-year design storms without overlopping the roads. The <br />proposed golf course construction did not increase the flow rates to these culverts.