My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1997 Council Packet
Orono
>
City Council
>
1997
>
02-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:49:19 PM
Creation date
7/31/2023 2:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cosiderable efforts have been made by the Minnehaha Creek Watershed District to improve <br />the water quality of Long Lake, with over $2.2 million spent in an effort in recent years. During <br />the design of the course, special attention has been, and wilt continue to be, given to <br />improving runoff quality from the present condition. The nutrient budget analysis indicates <br />significantly reduced levela from the existing condition (see Table 2). The stormwater <br />treatment ponds are intended to be constructed to treat the runoff from the golf course. The <br />runoff through the wetland complexes to Long Lake is routed through wet detention ponds <br />prior to discharge to Long Lake. The irrigation pond in the center drainage will collect runoff <br />for reuse as im'gation, thereby further reducing potential nutrient loading and reducing im'gation <br />needs. Since there is little impervious area and the flow must pass across well vegetated <br />grassy areas, it is anticipated that the golf course will not be a significant loading source. <br />Water quality and quantity control will be provided by three NURP basins designed for both <br />on-site and off-site drainage areas. The NURP basins are located along Spring Hill Road on <br />the upstream end of the existing culverts. Outlet structures are placed at the existing culverts <br />to control the flow rates. The ponds are sized to meet Minnehaha Creek Watershed District <br />and City requirements for NURP basin design. <br />The drainage was analyzed using stormwater modeling software based on Soil Conservation <br />Service methodologies. The modeling was set up to route 100-year, 10- year and 1-year <br />design storms through the existing wetlands, mitigation wetlands, NURP basins and road <br />culverts. <br />The proposed construction of the fairways, greens and tees will increase the volume of runoff <br />by 120% to 175% over the existing conditions. By using the detention storage available in the <br />wetlands, mitigation areas and NURP basins, the additional volume is controlled and the <br />proposed runoff rates leaving the Site are reduced to below the existing rates. <br />The existing and proposed runoff rates at the three major culvert crossings on Spring Hilt Road <br />are presented in Table 1. <br />TABLE 1 <br />RUNOFF RATES TO LONG LAKE <br />SPRING HILL RD <br />CULVERT <br />EXISTING CONDITIONS PROPOSED CONDITIONS <br />100 Yr.10 Yr.1 Yr.100 Yr.10 Yr.1 Yr. <br />15" CMP (NURP Basin 1)23 cfs 9 cfs 0 cfs 4 cfs 2 cfs 0.2 cfs <br />36" RCP (NURP Basin 2)23 cfs 11 cfs 1.4 cfs 16.5 cfs 11.5 cfs 0.4 cfs <br />42" RCP (NURP Basin 3)57 cfs 28 cfs 3 cfs 29 cfs 6.5 cfs 0.9 cfs <br />The roadway culvert crossings on County Road 6 arjd Spring Hill Road were also included in <br />the storm water flow rate modeling. Based on the results of the flow rating, these culverts are <br />capable of handling up to 100-year design storms without overlopping the roads. The <br />proposed golf course construction did not increase the flow rates to these culverts.
The URL can be used to link to this page
Your browser does not support the video tag.