My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1997 Council Packet
Orono
>
City Council
>
1997
>
02-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:49:19 PM
Creation date
7/31/2023 2:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PERMIT DATA FOR LAKE LONG <br />DNR PERMIT APPLICATIONS ISSUED OR DENIED AS OF MAY 1990 FOR LONG LAKE: <br />NUMBER NUMBER <br />PERMIT TYPES: ISSUED DENIED <br />PUBLIC (PROTECTED) WATERS PERMITS <br />Earthen Encroachment 4 <br />GENERAL APPROPRIATION PERMITS 0 <br />0 <br />0 <br />13. Water Use <br />a Will the project involve the installation or abandonment of any wells? . X_ Yes _ No <br />For abandoned wells give the location and Unique well number. For new wells, or other <br />previously unpermitted wells, give the location and purpose of the well and the Unique well <br />number (if known). <br />The current well supplying the conference center was installed in 1984. It is 178 feet in depth <br />is 10 inch diameter and is registered as a commercial well. The unique well number is <br />161437/27. This well will remain in use to supply future clubhouse needs. In addition, the 10 <br />inch well will be used to supply water to the imgation pond. When the well was installed the <br />well was tested at a 750 gallon pumping rate per minute for 24 hours. Drawdown after 24 <br />hours of pumping was 10 feet. An additional well will be installed to sen/ice the maintenance <br />facility and rest station. Exact locations of seme existing wells are not known at this time. It is <br />anticipated that up to three wells on the Site will require abandonment. Any unused wells <br />located on the Site will be abandoned according to State Department of Health regulations. <br />b. Will the project require an appropriation of ground or surface water (including dewatering)? <br />X Yes No <br />If yes, indicate the source, quantity, duration, purpose of the appropriation, and DNR water <br />appropriation permit number of any existing appropriation. Discuss the impact of the <br />appropriation on ground water levels. <br />Although there is the potential for short term dewatering during construction, no dewatering is <br />anticipated at this time. If dewatering becomes necessary, the appropriate permits will be <br />secured. <br />Irrigation water will be pumped to the surface and discharged to an irrigation pond located <br />along Spring Hill Road. Current estimates for normal pumping volumes are 140 to 160 acre <br />feet per year. First year pumping volumes are estimated at 200 acre feet to assist in <br />establishment of new turf. A new appropriation permit will be required because of changed use <br />of the existing well. <br />c. Will the project require connection to a public water supply? _ Yes No. If yes. identify <br />the supply, the DNR water appropriation permit number of the supply, and the quantity to be <br />used.
The URL can be used to link to this page
Your browser does not support the video tag.