Laserfiche WebLink
12/31/^96 07:35 NO. 816 007 <br />PROJECT : MINNETONKA BOAT WORKS DECEMBER 30. 1996 <br />LOCATION : ORONO, MINNESOTA <br />PREPARED FOR: GENMAR <br />PREPARED BY : SATHRE-BERGQUIST. INC. <br />NOTE : ALL AREAS DETERMINED BY PLANIMETERING <br />SUBJECT : HARDCOVER CALCUATION WORK SHEET <br />LOCATION: EAST SIDE OF C.S.A.H. NO. 15-ALTERNATE 3 (3 <br />SETBACK ZONE: 0-75' i 75-2501 250-500’ 500-1000’ <br />EXISTING HARDCOVER IN ZONE <br />SQUARE <br />HARDCOVER ITEM LENGTH (FT) x WIDTH (FT) = FEET (SF) <br />BUILDING ____________ _________ 820 SF. <br />PARKING LOT ___________ _________ 8.183 SF <br />TOTAL HARDCOVER IN ZONE (75-250’) « 9,003 SF <br />TOTAL PROPERTY IN ZONE (75-250’) = 12,176 SF <br />PERCENTAGE OF HARDCOVER IN ZONE (75-250’) = 73.94% <br />FOR THE EXISTING CONDITION <br />LOCATION : EAST SIDE OF C.S.A.H. NO. 15 - ALTERNATE 3 <br />SETBACK ZONE: 0-75’ j 75-250j 250-500’ 500-1000’’ <br />PROPOSED HARDCOVER IN ZONE <br />SQUARE <br />HARDCOVER ITEM LENGTH (FT) x WIDTH (FT) = FEET (SF) <br />mm mm ^m mrnmmm mm mm mm ^m mm ^mmm mmtmm mm ^m^m ^mmm mm ^m ^mmmm^m mm ^m ^mm mm^m ^m ^m ^m w mm ^m mmm mm mm mm mmm^mmm^^m mm mm ^m ^m m^m ^mmm* <br />BUILDING ___________ _________ 608 SF <br />PARKING LOT___________ ____________ 8.308 SF <br />TOTAL HARDCOVER IN ZONE (75-250’) = 8.916 SF <br />TOrU PROPERTY IN ZONE (75-250) = 12,176 SF <br />PERCENTAGE OF HARDCOVER IN ZONE (75-250 ) = 73.23% <br />FOR THE PROPOSED CONDITION