My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1997 Council Packet
Orono
>
City Council
>
1997
>
01-27-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:25:12 PM
Creation date
7/31/2023 2:19:30 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(?■ <br />K. <br />M. <br />N. <br />landscaping improvements will be completed concurrently with the <br />proposed site improvements. <br />Applicants have agreed to providing the following site improvements which <br />are required by the zoning code: <br />Sanitary facilities for slip customers, to be located within the new <br />building. <br />2) <br />3) <br />Boat head pumpout facility. <br />Upgraded stormwater management facilities meeting NURP <br />standards. <br />L. Applicants have agreed to provide these additional amenities to enhance the <br />attractiveness of this site: <br />Screening of the portable toilets which are intended to remain in use <br />on the Tanager Lake side of Shoreline Drive. <br />2) Building construction, facade and materials of a nature compatible <br />with the residential namre of the surrounding neighborhoods. <br />Signage of a subdued nature to soften the visual impact of allowed <br />signage. <br />Applicants have agreed to a number of site operation conditions and <br />limitations which will ensure that the operation of the site occurs in a <br />manner that will minimize the impacts of the intensity of use proposed for <br />the site, such conditions and limitations enumerated in the "Conclusions, <br />Order and Conditions" section of this Resolution. <br />The City engineer has conceptually approved the proposed stormwater plan <br />subject to specific modifications in the plan. <br />Page 9 of 15
The URL can be used to link to this page
Your browser does not support the video tag.